32
Analysis. Typical tasks and solutions
5.5.4
Back-to-back test settings
Figure 5.18. Configuring test settings
•
Enabled
— enable/disable back-to-back analysis.
•
Trial qty
— number of test trials performed for each specified frame
size.
•
Trial, s
— time of the trial performing (within 2–2886 s range) for each
of the specified frame sizes.
•
Rates
— switched to
Rates
menu (see fig. 5.16).
5.5.5
Advanced
Figure 5.19. Advanced menu
•
Wait time, ms
— period between end of test traffic generation and end
of trial.
•
Learn time, ms
— period between learning frame sending and trial
start.
In accordance with RFC 2544 methodology the
wait time
is 7000 ms and
learn time
is 2000 ms.
ETS-1000. Operations manual
Содержание ETS-1000
Страница 1: ...Ethernet Gigabit Ethernet Tester Analyzer ETS 1000 Operations manual Version 1 0 9 2009 Metrotek ...
Страница 6: ...6 ETS 1000 Operations manual ...
Страница 8: ...8 ETS 1000 Operations manual ...
Страница 10: ...10 ETS 1000 Operations manual ...
Страница 12: ...12 ETS 1000 Operations manual ...
Страница 18: ...18 ETS 1000 Operations manual ...
Страница 96: ...96 ETS 1000 Operations manual ...
Страница 108: ...108 ETS 1000 Operations manual ...