22
Analysis. Typical tasks and solutions
.
.
..
1
2
X %
2
Figure 5.3. Frame Loss Rate
4.
Back-to-back. The test allows estimating the time during which the DUT
is capable to manage the maximum load.
The analyzer sends a burst of frames with minimum interframe gap to
the DUT and then counts the number of frames forwarded by the DUT.
If the count of transmitted frames is equal to the number of frames
forwarded, the time of transmission is being increased and the test is
being rerun until there are two trials succeeded with no frame lost. If
the number of forwarded frames is less than the number of transmitted
ones, the time of transmission is being reduced and the test is being
rerun.
.
.
..
Figure 5.4. Back-to-Back
ETS-1000. Operations manual
Содержание ETS-1000
Страница 1: ...Ethernet Gigabit Ethernet Tester Analyzer ETS 1000 Operations manual Version 1 0 9 2009 Metrotek ...
Страница 6: ...6 ETS 1000 Operations manual ...
Страница 8: ...8 ETS 1000 Operations manual ...
Страница 10: ...10 ETS 1000 Operations manual ...
Страница 12: ...12 ETS 1000 Operations manual ...
Страница 18: ...18 ETS 1000 Operations manual ...
Страница 96: ...96 ETS 1000 Operations manual ...
Страница 108: ...108 ETS 1000 Operations manual ...