![Metrohm 930 Compact IC Flex Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/metrohm/930-compact-ic-flex/930-compact-ic-flex_manual_1779620024.webp)
3.3 Removing transport locking screws
■■■■■■■■■■■■■■■■■■■■■■
16
■■■■■■■■
930 Compact IC Flex SeS (2.930.1400)
3.3
Removing transport locking screws
To avoid damage to the drives for the high-pressure pump and the vac-
uum pump during transport, the pumps are secured with transport locking
screws. These are located at the rear of the instrument and labeled with
Transport security screws
.
Remove these transport locking screws before the initial start-up.
Accessories
For this step you need:
■
4 mm hex key (6.2621.030)
Removing the transport locking screws
Figure 6
Removing the transport locking screws
1
Transport locking screws
For the vacuum pump. Only present if the
instrument has a degasser or a CO
2
Suppres-
sor (MCS).
2
Transport locking screws
For the high-pressure pump.
1
Remove all of the transport locking screws with the hex key.
Содержание 930 Compact IC Flex
Страница 1: ...930 Compact IC Flex 930 Compact IC Flex SeS Manual 8 930 8007EN 2017 07 31 ...
Страница 2: ......