
61
INSTALLATION INSTRUCTIONS
9.1.10 In-Ceiling Mount
Suggest to power on the speed dome beyond -5°C (-23°F) or it would need 2~5
minutes to warm up before powered on
(1) Remove four tapes from dome cover then open the dome cover
counterclockwise. Please refer to Figure 1.
(2) Remove the pink EPE and the tapes on iron hooks. Please refer to Figure 2.
(3) Move the iron hooks to track bottom by turning screws counterclockwise.
Please refer to Figure 3.
(4) Push the iron hooks to center. Please refer to Figure 4.
(5) Glue the guide pattern on ceiling, drill the hole then mount the camera on
ceiling. Please refer to Figure 5.
(6) Push the iron hooks to both side, then move the iron hooks by turning
screws clockwise to fasten on ceiling. Please refer to Figure 6.
(7) The installation is completed, please note the minimum ceiling load required
is 3.6Kg (7.9 lb). Please refer to Figure 7.
Figure 1
Figure 2
Содержание NIC910/930/950HPro
Страница 2: ......
Страница 40: ...40 MENU INDEX 7 1 Menu Structure 1 1...
Страница 47: ...47 INSTALLATION INSTRUCTIONS Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8...
Страница 49: ...49 INSTALLATION INSTRUCTIONS Figure 4 Figure 3 Figure 5...
Страница 51: ...51 INSTALLATION INSTRUCTIONS Figure 2 Figure 3 Figure 4 Wiring Diagram...
Страница 56: ...56 INSTALLATION INSTRUCTIONS Figure 2 Figure 3 Figure 4 Figure 5 Figure 7 Figure 6 Figure 8...
Страница 62: ...INSTALLATION INSTRUCTIONS Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 62...
Страница 68: ......