19
Installation
Guide
Instructions for Installation & First Time Start-up
1
The facility will need to provide the appropriate grounded electrical outlet, hot and cold-
water
supply lines with shut off valves and standard 3/4” male garden hose fittings for each
supply or the hoses that are supplied with the system
. (USING ½” FULL PORT BALL VALVES
AND ½” ID HOSES IS PER
FERRED FOR ADEQUATE WATER SUPPLY)
A drain connection of
1.5” diameter minimum (see system specification of this manual for further assistance).
2
Connect the facility drain to the system drain with “P” trap.
3
Connect the facility hot and cold lines to the system hot and cold inlets.
4
Connect the solution container (see changing solutions containers section of this manual).
5
Apply water pressure by opening the facility supplied inlet valves and check for leaks.
6
Plug in the power cord.
7
Perform several hand wash cycles by blocking the photo optical sensor in the cylinder.
Allow enough time for the hot water supply to reach the system.
8
Check for leaks and the system is ready to use.
THE UNIT IS NOW READY FOR NORMAL HAND WASH OPERATION