background image

 

CLEANTECH® 500EZ 

Automated Hand and Glove Cleansing System 

 

 

INSTALLATION AND OPERATION MANUAL

 

 
 
 

 

Manufactured by:

  

Meritech Systems, LLC 

720 Corporate Circle, Suite K 

Golden, CO 80401 USA 

 

Phone:(800) 932-7707 

Fax:(303) 790-4859 

 

www.meritech.com

  

E-mail: 

[email protected] 

E-mail: 

[email protected] 

 
 
 
 
 
 
 
 

 

 
 

 

 
 

WARNING:  The performance and effectiveness of CleanTech® systems have been extensively tested 

when using solutions provided by Meritech Systems, LLC.  Satisfactory performance or effectiveness 

cannot be guaranteed when other solutions are used. 

 

FAILURE TO USE MERITECH SYSTEMS, LLC SUPPLIED  

CHEMICALS WILL VOID ANY AND ALL WARRANTIES. 

 

March 31, 2020 

 

Содержание CleanTech 500EZ

Страница 1: ...CleanTech 500EZ INSTALLATION AND OPERATION MANUAL March 31 2020...

Страница 2: ...w meritech com E mail cleantechinfo meritech com E mail service meritech com WARNING The performance and effectiveness of CleanTech systems have been extensively tested when using solutions provided b...

Страница 3: ...Indicators 11 Detailed System Reference 12 Water and Temperature Controls Cylinder Rotation Solution Delivery 13 Changing Solution Containers 14 Removing and Empty Container Installing a New Container...

Страница 4: ...ess This manual describes everything you will need to properly site install and maintain your system The CleanTech 500EZ will connect to your standard hot and cold water lines and drain A more detaile...

Страница 5: ...ons and pressurized water onto the hands followed by a potable water rinse To minimize cross contamination an infrared photo optical sensor positioned directly above the cylinders automatically senses...

Страница 6: ...nd material should be such that fastener is capable of supporting a 200 pound vertical force each 4 Hang the 500EZ onto the wall mount brackets two Hooks Verify the system is level and securely attach...

Страница 7: ...7 New Construction Rough In Diagram...

Страница 8: ...sibility for providing plumbing and electrical modifications to your facility However a Meritech representative will be happy to provide the necessary guidance to ensure a correct installation Follow...

Страница 9: ...SH IN THE SHORTEST PERIOD OF TIME 1 To initiate a cycle stand directly in front of the system and place your hands simultaneously into the center of each cylinder 2 The hygiene cycle will automaticall...

Страница 10: ...y of the hygiene event and the wash you will receive the cleansing solution works properly through a broad range of temperatures The period of time for the warm water to return to the station will dep...

Страница 11: ...are empty and needs to be replaced Master Resettable Compliance Monitor when washing and when rinsing The station also has a countdown timer that counts down from 12 0 and when it hits 0 it is safe to...

Страница 12: ...c application assistance contact Meritech at 1 800 932 7707 Consult with local plumbing authorities for proper connections and installation requirements The customer installed hot and cold water contr...

Страница 13: ...t panel monitor Visually examine each container and its clear delivery lines to determine if there is adequate fluid present and that the line is not blocked Change the solution containers if they are...

Страница 14: ...ase of solutions contains two solution tube assemblies each assembly consists of a cap tube barb with tube Follow these steps for all installations 1 Unscrew the protective cap from the new 2 gallon s...

Страница 15: ...15 Solutions Replacement Diagram...

Страница 16: ...e hose fittings from hot and cold water inlets Remove water filter screens rinse clean with tap water and reinstall water filter screens and hot and cold inlet lines Turn facility water shut off valve...

Страница 17: ...17 Maintenance Continued Taring Warning Symbols The following is a description of the symbols used on the CleanTech 500EZ system Tare Button...

Страница 18: ...18 Unpacking Instruction Preparing system for Unpacking Installation Carefully Remove Tape Carefully Remove Tape Carefully Remove Tape Carefully Remove Tape Carefully Remove Tape...

Страница 19: ...pecification of this manual for further assistance 2 Connect the facility drain to the system drain with P trap 3 Connect the facility hot and cold lines to the system hot and cold inlets 4 Connect th...

Страница 20: ...20 Cut Sheet A Solutions Housing B System Drain C Hot Cold Water Inlets D Water Filter Screens E Power Cord F Air Curtain CDA N2 Inlet F E C D B A...

Страница 21: ...21 Wall Mount Template Use Wall Mount Bracket as the template...

Страница 22: ...inimum 4 15 LPM GPM flow o 40 100 PSI 2 8 6 9 Bar 50 PSI 3 6 Bar optimum water pressure Note Consult Meritech if connecting more than 2 system on the same water lines Drain o Standard 1 1 2 40 mm drai...

Страница 23: ...at No 7 607 443 U S Pat No 7 617 830 U S Pat No 7 641 740 U S Pat No 7 659 824 U S Pat No 7 682 464 U S Pat No 7 698 770 U S Pat No 7 754 021 U S Pat No 7 754 022 U S Pat No 7 757 700 U S Pat No 7 758...

Страница 24: ...codes conformity and compliance to local and nation codes is the responsibility of the installer Consult your local plumbing code for specific details for your location and use a certified plumber for...

Страница 25: ...932 7707 Fax 303 790 4859 www meritech com E mail cleantechinto meritech com E mail service meritech com THE CLEANTECH 500EZ HAS BEEN DESIGNED TO OPERATE SPECIFICALLY WITH THE HAND WASH SOLUTIONS PRO...

Страница 26: ...s and remedies relating to the Product WARRANTY DISCLAIMER MERITECH S RESPONSIBILITY FOR DEFECTS IN THE PRODUCT IS LIMITED TO REPAIR OR REPLACEMENT AT MERITECH S ELECTION AS SET FORTH IN THIS LIMITED...

Страница 27: ...and defend Meritech and its members managers officers affiliates agents and employees against any and all losses damages claims lawsuits demands causes of action judgments liabilities and expenses in...

Отзывы: