P 9
Please retain product label and instructions for future reference
70mm
screw
Step 13
Parts Needed - No. 23a QTY 2
No. 23b QTY 1
No. 26 QTY 1
Following the method shown in
the illustration, place Top Gable A
(No. 23a),
Top Gable B
(No. 23b)
and the remaining Finisher board
(No. 26)
onto the log cabin.
*Ensure that the boards are
level and flush with each other
as you lay each one.
Fix each board to the one below
by screwing through the notch
as shown in the illustration using
1x70mm screw per corner.
**Ensure to stagger the screws
so as not to collide with the
previous screw.
4x70mm Screws
Pre drill
hole
26
23a
Rubber Mallet
may be required
to fit parts.
23b
23b
23a
32
32
Pre drill
hole
70mm
screw
Step 14
Parts needed - No. 32 QTY 1
Align the Roof Purlin (
No. 32
)
into the cut out slots on each gable
top ensuring they interlock.
Secure the roof purlin at each
end by screwing through the purlin
into the boards (
ensure to pre-drill
to avoid the boards splitting
) using
2x70mm screws per purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ in
width from your choice in product.
Nevertheless, despite any differences
the process of fixing the purlins is the
same.
4x70mm Screws
a
b
a
32
b
Rubber Mallet
may be required
to fit parts.