![Mercia Garden Products 0619PNNE2424HGDD1SW-V1 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/mercia-garden-products/0619pnne2424hgdd1sw-v1/0619pnne2424hgdd1sw-v1_general-instructions-manual_1772563007.webp)
P 7
Please retain product label and instructions for future reference
2
4
IMPORTANT :
Pre-drill before fixing screws.
Step 8
Parts Needed - No. 2 QTY 1
No. 3 QTY 1
No. 4 QTY 1
No. 5 QTY 1
Arrange the left, right, top & bottom window
frames (
No’s. 2, 3, 4,& 5
) onto a firm and level
surface. Secure the top and bottom frames to
the uprights using 2x80mm screw per corner,
ensuring the screws do
NOT
protrude through
the front of the window framing.
8x80mm Screws
Pre drill
hole
80mm
screw
5
3
5
3
The lip of the door frame should
be postioned on the inside of
the building.
.
Step 9
Once you have laid the second level
of boards onto the log cabin, slide
the windows between the smaller
boards and rest on to the longer
board
(if you have not yet
assembled the window frames refer
to step 8)
*Ensure the boards are level with
each end.
*Please note:
This image is for
illustrative purposes and may differ
from your choice in product
(
regarding window position
).
Nevertheless the process of fitting the
window is the same
Step 10
Parts Needed - No. 25 QTY 12
No. 28 QTY 12
No. 29 QTY 12
Following the method shown in the
illustration, lay a further 6 boards
(
No.25, 28 & 29
) onto each side of
the log cabin. The boards should sit
just below the top of the door and
window frames, as shown in the
illustration.
*Ensure that the boards are level
and flush with each other as you lay
each one.
25
25
29
28
28
29