background image

P 14

Please retain product label and instructions for future reference

             

HANDLE

WITH CARE

1

2

3

4

Felt 

tacks 

Step 25

Parts needed - No. 42

Cut the felt 

(No. 42)

 

into three strips of: 

2500mm (L) X 1000mm (W)

and lay onto the roof in the order shown 

in the illustration.

*Ensure there is approximately 50mm of 

overhanging felt each side.

Once the felt is laid out fix to the roof 

using felt tacks at 100mm intervals.

*Felt size: 2500mm (L) X 1000mm (W)

110 x Felt Tacks

1.

2.

3.

42

40mm 

screw

Pre drill 

hole

36

35

36

Step 26

Parts Needed - No. 35 QTY 2

                                 No. 36 QTY 2

Attach the fascia’s (

No. 35 & 36

) around 

the building (

ensuring to trap the felt 

in between the fascia’s

) securing into 

place using 3x40mm screws per fascia.

Ensure the fascia at the back of the log 

cabin sits level or lower than the felt to 

allow water to run off. 

*Once in place mark the excess fascia 

with a pencil and trim the fascias to 

follow the shape of building as shown 

in the illustration.

12x40mm Screws

35

Содержание 0619PNNE2424HGDD1SW-V1

Страница 1: ...rm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to a...

Страница 2: ...m 71x70x805mm Qty 1 AI 0619LOGSWBF V3 7 6 Inch T Hinge QTY 2 PI 07 0113 8 Casement Stay Qty 1 PI 07 0008 Double Door Contents 10 9 11 12 Mortice Lock Qty 1 PI 07 0017 Key Plate Qty 1 Handles Pair Qty...

Страница 3: ...PT 39 40 Storm Brace 44x27x2000mm QTY 8 F2744 2000 41 Closure Trim 16x28x2400mm approx length QTY 8 S1628 2400 42 Felt Roof Spacers QTY 5 PI 07 0208 20x100x2mm 43 Log Board 120x19x2396mm QTY 45 LB19...

Страница 4: ...n total ensuring the bearers are flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are no...

Страница 5: ...oard No 25 and fix the starter boards in place Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws 24 25 Step 4 Parts Ne...

Страница 6: ...the starter up the door section slide the assembled door frame over the boards resting the frame on top of the starter board if you have not yet assembled the door frame refer to step 5 Please note Th...

Страница 7: ...e second level of boards onto the log cabin slide the windows between the smaller boards and rest on to the longer board if you have not yet assembled the window frames refer to step 8 Ensure the boar...

Страница 8: ...ber Mallet may be required to fit parts 70mm screw Step 12 Parts Needed No 22 QTY 2 No 25 QTY 1 No 27 QTY 1 Following the method shown in the illustration place the bottom gable No 22 the remaining Lo...

Страница 9: ...so as not to collide with the previous screw 4x70mm Screws Pre drill hole 26 23a Rubber Mallet may be required to fit parts 23b 23b 23a 32 32 Pre drill hole 70mm screw Step 14 Parts needed No 32 QTY 1...

Страница 10: ...rlin will be longer than the log boards by 2mm each end You have been issued with 23 roof boards but in reality you may only need to use 22 The last roof board will overhang past the end of the roof p...

Страница 11: ...8 Parts Needed No 8 Qty 1 Fix the casement stay No 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm black screws Ensure the casement stay is centralised on the wind...

Страница 12: ...is for illustrative purposes and may differ from your choice in product regarding ironmongery Nevertheless the process of fixing the frames is the same 8x30mm Black Screws 4x30mm Screws a b 30mm scre...

Страница 13: ...x40mm screws per board Please Note Ensure to screw through each of the floor boards into the floor bearers 126x40mm Screws Closure Trim Internal 23 Measure and cut the closure trims to fit the interna...

Страница 14: ...t tacks at 100mm intervals Felt size 2500mm L X 1000mm W 110 x Felt Tacks 1 2 3 42 40mm screw Pre drill hole 36 35 36 Step 26 Parts Needed No 35 QTY 2 No 36 QTY 2 Attach the fascia s No 35 36 around t...

Страница 15: ...ow moisture Summer Storm braces will help your building expand and contract properly Important Ensure each bolt is tightened using a washer so as not to damage the log boards 16x60mm Bolt Sets Step 28...

Отзывы: