background image

P 12

Please retain product label and instructions for future reference

             

IMPORTANT : 

Pre-drill before fixing screws.

Pre drill 

hole

30mm 

screw

Step 20

Parts Needed - No. 18 QTY 1

 

 

   

No. 19 QTY 1

 

 

   

No. 20 QTY 1

 

 

Fit the Mortice Lock 

(No. 19) 

into 

the recess in the master door 

(No. 9) 

and 

secure using the screws provided. Attach 

the Key Plate 

(No. 20)

 to the slave door 

(No. 10)

 with 4x30mm screws.

 

Fit the Door Handles 

(No. 18) 

and 

connect with the metalbar to the mortice 

lock using 8x30mm black screws. Ensure 

the lock mechanism closes correctly. If not, 

remove the lock and turn the catch around 

using the small grub screw.

*Please note:

 This image is for illustrative 

purposes and may differ from your choice in 

product (

regarding ironmongery

).

Nevertheless the process of fixing the frames 

is the same.

8x30mm Black Screws

4x30mm Screws

a

b

30mm 

screw

The Mortice Lock is Reversible

a

b

18

20

19

10

9

Step 21

Parts Needed - No. 15 QTY 1

 

 

   No. 21 QTY 2

Attach the Door Strip 

(No. 15)

 to the 

back of the slave door using 4x40mm 

screws as shown.

 

Once fixed, place the Tower 

Bolts 

(No. 21) 

roughly into position at 

the top and bottom of the door strip. 

With a pencil mark the around the bolt.

 

After marking the bolt onto the 

frame, drill a hole for the barrel bolt to 

locate into.

 

Following the hole being drilled, 

place the tower bolts into position and 

secure using the screws provided.

4x40mm Screws

a

b

c

c

Pre drill 

hole

40mm 

screw

21

IMPORTANT : 

Pre-drill before fixing screws.

15

b

a

Содержание 0619PNNE2424HGDD1SW-V1

Страница 1: ...rm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to a...

Страница 2: ...m 71x70x805mm Qty 1 AI 0619LOGSWBF V3 7 6 Inch T Hinge QTY 2 PI 07 0113 8 Casement Stay Qty 1 PI 07 0008 Double Door Contents 10 9 11 12 Mortice Lock Qty 1 PI 07 0017 Key Plate Qty 1 Handles Pair Qty...

Страница 3: ...PT 39 40 Storm Brace 44x27x2000mm QTY 8 F2744 2000 41 Closure Trim 16x28x2400mm approx length QTY 8 S1628 2400 42 Felt Roof Spacers QTY 5 PI 07 0208 20x100x2mm 43 Log Board 120x19x2396mm QTY 45 LB19...

Страница 4: ...n total ensuring the bearers are flush Once fully assembled ensure the bearers are square by measuring from corner to corner as illustrated making sure the measurements are equal If the bearers are no...

Страница 5: ...oard No 25 and fix the starter boards in place Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws 24 25 Step 4 Parts Ne...

Страница 6: ...the starter up the door section slide the assembled door frame over the boards resting the frame on top of the starter board if you have not yet assembled the door frame refer to step 5 Please note Th...

Страница 7: ...e second level of boards onto the log cabin slide the windows between the smaller boards and rest on to the longer board if you have not yet assembled the window frames refer to step 8 Ensure the boar...

Страница 8: ...ber Mallet may be required to fit parts 70mm screw Step 12 Parts Needed No 22 QTY 2 No 25 QTY 1 No 27 QTY 1 Following the method shown in the illustration place the bottom gable No 22 the remaining Lo...

Страница 9: ...so as not to collide with the previous screw 4x70mm Screws Pre drill hole 26 23a Rubber Mallet may be required to fit parts 23b 23b 23a 32 32 Pre drill hole 70mm screw Step 14 Parts needed No 32 QTY 1...

Страница 10: ...rlin will be longer than the log boards by 2mm each end You have been issued with 23 roof boards but in reality you may only need to use 22 The last roof board will overhang past the end of the roof p...

Страница 11: ...8 Parts Needed No 8 Qty 1 Fix the casement stay No 8 onto the window No 1 and the casement stay pins to the window framing using 6x30mm black screws Ensure the casement stay is centralised on the wind...

Страница 12: ...is for illustrative purposes and may differ from your choice in product regarding ironmongery Nevertheless the process of fixing the frames is the same 8x30mm Black Screws 4x30mm Screws a b 30mm scre...

Страница 13: ...x40mm screws per board Please Note Ensure to screw through each of the floor boards into the floor bearers 126x40mm Screws Closure Trim Internal 23 Measure and cut the closure trims to fit the interna...

Страница 14: ...t tacks at 100mm intervals Felt size 2500mm L X 1000mm W 110 x Felt Tacks 1 2 3 42 40mm screw Pre drill hole 36 35 36 Step 26 Parts Needed No 35 QTY 2 No 36 QTY 2 Attach the fascia s No 35 36 around t...

Страница 15: ...ow moisture Summer Storm braces will help your building expand and contract properly Important Ensure each bolt is tightened using a washer so as not to damage the log boards 16x60mm Bolt Sets Step 28...

Отзывы: