Mellanox Grid Director 4700 Installation Manual
67
Pull the ejector outward on both ends of the Line Board.
Figure 29: Using Ejectors to remove a Fabric Board
The ejector mechanism on the Management Board (sMB-CM) is the identical to the one
used on the Line and Fabric boards.
It is recommended to tighten the two board screws before starting to operate the system
Refer to Torque Settings for torque specifications.
When inserting the screws, make sure that they are inserted directly into their groove and that
they slide in easily. It is recommended to start the insertion manually to ensure that the insertion
is correct.
When using an electric screwdriver to fasten the board screws in place, do not use more
than Torque 3 force as this could damage the screws.
7.3
Installing Fabric Boards
Up to nine fabric boards can be installed at the front of the 4700 chassis to achieve a fully
non-blocking system.