Packing and Unpacking
44
Part Number
Description
8
Cardboard Box
9
Pallet
4.2
Unpacking the Grid Director 4700
To unpack the Grid Director 4700 chassis:
1.
Carefully cut the packing straps and open the carton box.
2.
Remove the box from around the chassis by sliding it upwards, as shown.
The Grid Director 4700 chassis in its partially unpacked state is shown as follows.
The upper packing foam covering the Grid Director 4700 contains the following
components:
Rail kit
Cabling guide brackets (cable management)