
FOCKE MELER GLUING SOLUTIONS
4-2
MELTER OPERATION
Warning:
Do not fill the tank above the loading opening level.
To fill the tank:
1. Open the tank lid
2. Use a shovel or a ladle to fill the tank with adhesive. Do not fill the tank
above the loading opening level. The lid must be able to close normally.
Warning
: Risk of burns. Always refill using protective gloves and goggles.
3. Close the lid when you have finished refilling the tank
Manual starting up the melter equipment
Warning:
Automatic start depends on the type of set-up and the installation
conditions of the unit. For more information, please see the ‘Turn off function
after resetting’ and ‘Setting up the turning on and activation of pumping’
sections.
Before starting up the melter equipment, it is necessary to check to see if
the unit has been correctly installed and all its input/output and accessory
connections are correctly established.
It is also necessary to make sure that the equipment has been filled with
adhesive and that the operational parameters have been programmed.
To start:
1. Connect the melter’s switch.
When the switch is actuated, the GREEN POWER LED remains lit. The unit
is powered but the screen stays off.
2. When you press the ON/OFF button, the screen lights up and the POWER
LED stays lit. The main screen shows the unit’s status.
Once it has reached 3° below the programmed temperature (set point)
of the all active elements, a programmable delay timer starts until,
guaranteeing fusion, the pump receives permission to operate and
the signal will be sent to the main machine by the external output
‘Temperature OK’.
While the system counts down the delay time, the temperature OK
symbol flashes until the programmed time value is reached. The
screen displays the actual temperature values for each zone at all
times.
If the temperatures of all the active zones exceed the set point
temperature -3° in under 5 minutes, the unit will pass to ‘Temperature
OK’ status without taking the ‘Pumping Permission Delay’ into account.
Model
Capacity*
5
5.15 L
5.15 kg
10
9.7 L
9.7 kg
20
19.7 L
19.7 kg
35
37.4 L
37.4 kg
* for density of 1g/cm
3
Содержание Micron + 10
Страница 10: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Страница 38: ...FOCKE MELER GLUING SOLUTIONS INSTALLATION 3 16 This page is intentionally left blank ...
Страница 74: ...FOCKE MELER GLUING SOLUTIONS 4 36 MELTER OPERATION This page is intentionally left blank ...
Страница 84: ...FOCKE MELER GLUING SOLUTIONS 5 10 MAINTENANCE This page is intentionally left blank ...
Страница 90: ...FOCKE MELER GLUING SOLUTIONS 6 6 TECHNICAL CHARACTERISTICS This page is intentionally left blank ...
Страница 91: ...MA 5162 ENG MICRON PISTON ADHESIVE MELTER ELECTRICAL DRAWINGS 7 1 7 ELECTRICAL DRAWINGS ...
Страница 92: ...FOCKE MELER GLUING SOLUTIONS 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Страница 97: ...MA 5162 ENG MICRON PISTON ADHESIVE MELTER PNEUMATIC DIAGRAM 8 5 Pneumatic diagram for 19 cm3 stroke PUMP ...
Страница 102: ...FOCKE MELER GLUING SOLUTIONS 8 10 PNEUMATIC DIAGRAM This page is intentionally left blank ...
Страница 104: ...FOCKE MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank ...