
46
Maintenance
IMPORTANT
Maintenance should only be completed on the CyClean-R system by those with suitable qualifications.
Ionisation Equipment
INFORMATION
For detailed instruction, please consult the equipment’s operating manual.
Ionisers require periodic cleaning. During normal operation, dirt will build-up on the emitter pins and upon the body
of the ioniser. This will cause a reduction in performance.
Typically, weekly cleaning is sufficient. However, equipment used in some heavy contamination areas, such as
gravure printing or where plastic fumes are present, may require daily cleaning. Equally, in a Class 100 area, cleaning
may only be required on a monthly basis.
Advanced systems with performance monitoring, e.g. 977CM and 904CM, will alert the operator to the need to
clean the equipment before performance drops to an unacceptable level.
Before cleaning, ensure that the equipment is switched off.
Emitter pins can be cleaned very effectively with a brush. A dry toothbrush is ideal.
Ionising bars will need periodic wiping to clean grey deposits from the surface of the bar. A cloth moistened with a
small amount of IPA or methylated spirits is recommended.
Should you have any additional questions regarding the maintenance of Meech equipment please contact Meech
International directly or your local Meech distributor.
Fault Finding
Fault finding guides for the Meech Model A924 DC ionising bars can be downloaded directly from the Meech
website at www.meech.com
For further fault-finding guidance please contact Meech International directly or your local Meech distributor.
AHU
Consult the AHU manual for full installation and operation instructions.