
43
Commissioning
Initial Setup
The CyClean-R system is pre-set at Meech. This is a default setting that may need to be adjusted to achieve more
efficient and effective cleaning results.
INFORMATION
Before using the CyClean-R for production, it is recommended an initial setup and test is carried out to achieve the
optimum cleaning performance of the system.
When the CyClean-R has been set up, an initial test is recommended. This should be done by marking out a small
section on the web and adding a small amount (approximately 10mg) of contamination, before passing the web
through the CyClean-R manifold and 924IPS Bars.
1
1
2
2
3
3
4
4
5
5
6
6
A
A
B
B
C
C
D
D
Meech International
2 Network Point
Range Road, Witney
OX29 0YN, UK
Tel: +44 (0) 1993 706700
Fax: +44 (0) 1993 776977
email: [email protected]
web: www.meech.com
'Meech International' is a trading style
of Meech Static Eliminators Ltd
TITLE :
DRAWING NO:
MATERIAL :
FINISH :
TOLERANCE UNLESS OTHERWISE SPECIFIED
Machined Work Metric ± 0.1mm
Unmachined Fabrications ± 1mm
Angular ± 0°30'
DIMENSIONS IN MM DO NOT SCALE
CRITICAL TO FUNCTION (CTF)
DIMENSIONS AS MARKED
PROJECTION
SHEET
A3
SCALE
DATE :
12/06/2020
REVISION :
SHEET :
1 / 1
DETAIL :
DRAWN BY :
CHECKED BY :
SIGNED OFF BY :
COPYRIGHT © MEECH STATIC ELIMINATORS LTD 2020
THIS DOCUMENT AND THE INFORMATION THEREIN IS THE PROPERTY OF MEECH INTERNATIONAL AND SHOULD NOT BE COPIED IN WHOLE OR USED FOR MANUFACTURE OR OTHERWISE DISCLOSED WITHOUT THE PRIOR WRITTEN CONSENT OF MEECH INTERNATIONAL.
We
b D
ire
cti
on
Place Contamination Here
Before Enterting CyClean-R
Inspect Cleaning Results Once
Passed Through CyClean-R
Once the web has been passed through the CyClean-R and 924IPS Bars, check the marked area for remaining
contamination. If contamination is still present, adjustments may need to be made to enhance the cleaning
performance.
1
1
2
2
3
3
4
4
5
5
6
6
A
A
B
B
C
C
D
D
Meech International
2 Network Point
Range Road, Witney
OX29 0YN, UK
Tel: +44 (0) 1993 706700
Fax: +44 (0) 1993 776977
email: [email protected]
web: www.meech.com
'Meech International' is a trading style
of Meech Static Eliminators Ltd
TITLE :
DRAWING NO:
MATERIAL :
FINISH :
TOLERANCE UNLESS OTHERWISE SPECIFIED
Machined Work Metric ± 0.1mm
Unmachined Fabrications ± 1mm
Angular ± 0°30'
DIMENSIONS IN MM DO NOT SCALE
CRITICAL TO FUNCTION (CTF)
DIMENSIONS AS MARKED
PROJECTION
SHEET
A3
SCALE
DATE :
12/06/2020
REVISION :
SHEET :
1 / 1
DETAIL :
DRAWN BY :
CHECKED BY :
SIGNED OFF BY :
COPYRIGHT © MEECH STATIC ELIMINATORS LTD 2020
THIS DOCUMENT AND THE INFORMATION THEREIN IS THE PROPERTY OF MEECH INTERNATIONAL AND SHOULD NOT BE COPIED IN WHOLE OR USED FOR MANUFACTURE OR OTHERWISE DISCLOSED WITHOUT THE PRIOR WRITTEN CONSENT OF MEECH INTERNATIONAL.
We
b D
ire
cti
on
Place Contamination Here
Before Enterting CyClean-R
Inspect Cleaning Results Once
Passed Through CyClean-R