![MEDAP FINA AIR Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/medap/fina-air/fina-air_operating-instructions-manual_1759334022.webp)
Taking the unit out of operation
Setting the flow for treatment
22
GA 5752 2806 GB 10
5
5
Taking the unit out of operation
WARNING!
Disengage!
When the product is disengaged (removed) from the terminal unit the pressure
energy may cause recoil.
Use the terminal unit in parking position or support when disengaging.
NOTE
Refer to the medical gas distributor instructions for information regarding detaching
the gas probe from the medical gas distributor.
All versions:
After having completed the treatment, close the adjustment screw by turning it clockwise and
check to ensure that it is closed.
Disconnect the gas probe from the terminal unit.
Version B: Tapping unit with rail clamp
Remove the unit from the equipment rail. For this purpose, pull the locking lever and lift the
unit off the equipment rail.