325
315
290
949
303
218
24
4-INSTALLATION AND ASSEMBLY
HOLE FOR PELLET LOADING HATCH ASSEMBLY
The product can be installed on a masonry base, built at the time of installation, or a support (optional) can be purchased, to raise the
product to a suitable height. The measurements, recommended by us, range from 50 to 60 cm under the surface that product sits on.
When drilling the hole for loading hatch assembly, there are compulsory measurements provided by the length of the loading pipe, that
need to be observed.
Below is the drawing with the recommended and compulsory measurements for quicker installation.
Содержание Vivo 85 Hydro
Страница 1: ...INSTALLATION GUIDE EN INSERT VIVO 85 PELLET HYDRO Instructions in English...
Страница 73: ......
Страница 74: ......
Страница 75: ......