Comet Executive Gas
Preventive Maintenance
4-1
Chapter 4
PREVENTIVE MAINTENANCE
Various components of the Comet Executive™ Gas require scheduled attention to ensure long life
and trouble-free operation. The Preventive Maintenance (PM) Schedule below and on the next page
outlines all of the PM tasks required at regular intervals. All tasks are the responsibility of maintenance
personnel unless otherwise indicated.
Since operators run the machines, they should be trained on site to visually inspect common areas daily
and notify maintenance personnel when problems are found, such as worn or broken ribbons. All PM
intervals are based on 8-hour/day operation. Increase the PM frequency for two- or three-shift operations.
Preventive maintenance should only be done when the power is turned OFF at the main disconnect
switch. Specific preventive maintenance that requires the unit to be running should be done with extreme
caution and attention to detail.
Daily, Weekly Tasks
Preventive Maintenance Schedule beginning
FREQUENCY OF TASKS BASED ON HOURS OF OPERATION
Preventive Maintenance Tasks
Operator Maintenance Ironer Condition
4.1 Daily (8 Hours)
Watch and Listen for Anything Abnormal
X
Running/Hot
X
Off/Disconnect Power/Cool
Check and Clean Temperature Sensor
X
Off/Disconnect Power/Cool
X
Off/Disconnect Power/Cool
X
X
Running/Cool
X
Running/Hot
4.2 Weekly (50 hours)
X
Off/Disconnect Power/Cool
X
Off/Disconnect Power/Cool
X
Off/Disconnect Power/Cool
X
Off/Disconnect Power/Cool
X
Off/Disconnect Power/Cool
X
Off/Disconnect Power/Cool
Check and Clean Sail Switch and Exhaust
X
Off/Disconnect Power/Cool
Check Ribbon Condition and Tension
X
Running/Cool
TOC
INDEX
Содержание Comet Executive Exec-56-G
Страница 1: ...INSTRUCTION MANUAL COMET EXECUTIVE Gas Heated Flatwork Ironer...
Страница 42: ......
Страница 58: ......
Страница 80: ......
Страница 164: ......
Страница 166: ...SC 2 Motor Circuit 115V 1 Phase SC TOC INDEX TOC...
Страница 168: ...SC 4 Motor Circuit 230V 1 Phase SC TOC INDEX TOC...
Страница 170: ...SC 6 Motor Circuit 230V 3 Phase SC TOC INDEX TOC...
Страница 172: ...SC 8 Motor Circuit 415V 3 Phase SC TOC INDEX TOC...
Страница 174: ...SC 10 Motor Circuit 460V 3 Phase SC TOC INDEX TOC...
Страница 176: ...SC 12 Main Electrical Panel 115V 1 Phase SC TOC INDEX TOC...
Страница 178: ...SC 14 Main Electrical Panel 230V 1 Phase SC TOC INDEX TOC...
Страница 180: ...SC 16 Main Electrical Panel 230V 3 Phase SC TOC INDEX TOC...
Страница 182: ...SC 18 Main Electrical Panel 460V 3 Phase SC TOC INDEX TOC...
Страница 184: ......
Страница 185: ...TOC INDEX...
Страница 186: ......
Страница 187: ...TOC INDEX...
Страница 188: ......
Страница 189: ...TOC INDEX...
Страница 190: ......
Страница 192: ......
Страница 194: ......
Страница 196: ......
Страница 197: ...304500 1a TOC INDEX MB TOC...
Страница 198: ...TOC INDEX MB TOC...
Страница 199: ...TOC INDEX MB TOC...
Страница 200: ...TOC INDEX MB TOC...
Страница 221: ...3045069 TOC INDEX MB TOC...
Страница 222: ...TOC INDEX MB TOC...
Страница 223: ...TOC INDEX MB TOC...
Страница 224: ...TOC INDEX MB TOC...
Страница 225: ...46 7796 6 90 836 4 1 36 38 6 7 3 4 1 0 3980 8 0 2 2 7 6 7 3 238 3 68 8 2 7 6 7 8 8 2 83 2 4392 7 TOC INDEX MB TOC...
Страница 229: ...TOC INDEX MB TOC...
Страница 230: ...TOC INDEX MB TOC...
Страница 231: ...TOC INDEX MB TOC...
Страница 232: ...TOC INDEX MB TOC...
Страница 236: ......
Страница 238: ......
Страница 244: ......