1. Plug the power supply plug of the supply

transformer into the power supply socket.
The red supply LED (D1, page 6) will then
light up. 

2. Actuate the on-off switch (T1, page 7) 

on the control panel. At that moment, 
the control panel establishes a connection
to the receiver. This process is indicated
by display LED 1 (D1, page 7) lighting up
yellow. When a connection has been esta-
blished, the display LED 1 changes colour
to green. The display LED 2 (D2, page 7)
then also lights up green. Furthermore, the
presence of the functioning connection is
denoted by the green operation LED (D2,
page 6) at the receiver. 

3. Joysticks K1 and K2, the multidirectional

switch M1, the speed regulator S1 and
the two “function” and “off” buttons are
used for actuating the individual functions
of the gantry crane.

Push K1 upwards: 
the load hook on the cable is lowered.

Push K1 downwards: 
the load hook on the cable is raised.

Push K1 to the right: 
crane cab moves to right.

Push K1 to the left: 
crane cab moves to left.

Push K2 to the left: 
the crane cab rotates anticlockwise.

Push K2 to the right: 
the crane cab rotates clockwise.

Push M1 upwards:
the crane bridge moves forwards.

Push M1 downwards:
the crane bridge moves backwards.

The speed of the crane platform can
be changed via linear regulator S1.

It is not possible to actuate both func-
tions on joystick K1 at the same time. 

The further the joysticks K1 and K2 
are located from their centre positions,
the higher the speed at which the
respective function will be performed. 
If the load hook is in its lower end posi-
tion, the rope is wound up in the oppo-
site direction when the “Lower load
hook” function is triggered again. This
automatically leads to the direction in
the vertical operator level being reversed
for joystick K1.  

Press “function” button: 
The illumination in the crane cab, the
flood lamp and (if connected) the electro-
magnet will all be switched on together.

Press “off” button: 
the power consuming devices switched
on via “function” are again switched off.
If the function is at first switched off,
pressing the “off” button will switch it
on until the button is released again.

If no actuations are made to the trans-
mitter for a certain period of time, the
device will automatically switch off. By
pressing the on-off switch (T1, page 7),
you can reactivate the control panel at
any time.

Note: If the receiver is installed in a
concealed location, then the operating
indicator is not visible. Thus it is also
not possible to determine whether there
is a connection between the control
panel and the receiver (operating LED
D2 on the receiver lights constantly
green) or whether the connection has
been interrupted by the automatic
switch-off via the control panel (opera-

ting LED D2 on receiver flashes on and
off). In such a case, it is advisable to
connect an indicator lamp to contact
L1 of the receiver and to position this
on the system in such a way that it is
clearly visible.

Ensure that the distance between 
control panel and receiver is not too
large (< 6 metres). 

22

Commissioning

K1

K1

K1

K1

K1

K1

K1

K1

K2

K2

K2

K2

M1

M1

M1

M1

Содержание Portalkran 76500

Страница 1: ...Portalkran 76500...

Страница 2: ...rane 9 Notes for operation 18 Commissioning 20 Maintenance 31 Page Fonction 5 Montage de la grue portique 9 Instructions de service 19 Mise en service 20 Maintenance 31 Blz Functie 5 Portaalkraan opbo...

Страница 3: ...ieferumfang 1 Grundplatte 2 Kranbr cke 3 Kranhaus 4 Empf nger 5 Kabelloses Bedienpult 6 Elektromagnet 7 Anschlussmaterial H0 model of a gantry crane with the following functions A motorised crane brid...

Страница 4: ...de montage 2 Pont roulant 3 Cabine de grue 4 R cepteur 5 Pupitre de commande sans fil 6 lectro aimant 7 Mat riel de raccordement H0 model van een portaalkraan met de volgende functies Motorisch bestu...

Страница 5: ...ot function with gantry crane Affectation des broches du r cepteur D1 DEL de l alimentation D2 DEL de fonctionnement A1 Raccordement de la tension d alimen tation A2 Pas utilis avec la grue portique A...

Страница 6: ...2 auf der Vorder seite des Bedienpults sind ohne Funktion beim Portalkran Control panel button allocation D1 Display LED 1 D2 Display LED 2 T1 On off switch T2 Mode switch T3 Not used for gantry crane...

Страница 7: ...d affectation pour la grue portique Les 4 touches R1 R2 L1 L2 sur la partie avant du pupitre de commande n ont aucune fonction pour la grue portique Toetstoewijzing bedieningspaneel D1 Signalering LED...

Страница 8: ...1 Installing the base plate 1 Installez la plaque de montage 1 Grondplaat aanbrengen 9 360 mm 360 mm 343 mm 343 mm 10 mm 4 mm Portalkran aufbauen Assembling the gantry crane Montage de la grue portiqu...

Страница 9: ...er Gebrauchs anleitung des Versorgungstransformators 2 Connecting the base plate Note supply transformer not included in delivery scope The following transformers have been checked and approved by M r...

Страница 10: ...s curit indiqu es dans la notice d utilisation du transformateur d alimentation 2 Grondplaat aansluiten N B Een voedingstrafo wordt niet bijgele verd De volgende transformators zijn door de fa M rklin...

Страница 11: ...rating indicator optional 3 Raccord du t moin de fonction nement additionnel en option 3 Extra bedrijfsindicatie aansluiten optioneel 12 Portalkran aufbauen Assembling the gantry crane Montage de la g...

Страница 12: ...t roulant en place Retirer les but es de fin de course tampons et supports Enfiler les champignons de guidage sur l un des c t s du pont roulant dans les renflements pratiqu s dans les deux rails D pl...

Страница 13: ...e de grue Retirer les but es de fin de course tampons et supports Enfiler les champignons de guidage sur l un des c t s du ch ssis dans les ren flements pratiqu s dans les deux rails D placer la cabin...

Страница 14: ...ed you may connect the lifting magnet 6 Si vous le d sirez vous pouvez raccorder l lectro aimant de levage 6 Desgewenst kunt u de hefmagneet aanbrengen 15 1 4 2 3 Portalkran aufbauen Assembling the ga...

Страница 15: ...ger verstellen 7 Adjusting the crane jib 7 R glage de la fl che de la grue 7 Kraangiek verstellen 16 1 2 3 1 2 3 Portalkran aufbauen Assembling the gantry crane Montage de la grue portique Portaalkraa...

Страница 16: ...l symbols Cd Cadmium Hg Mercury Pb Lead 8 Pupitre de commande ins rez les piles Type de piles appropri es mignon AA Les piles ne font pas partie de la fourniture Attention faites attention la polarit...

Страница 17: ...wird von diesem Magneten angezogen In practice it is virtually never necessary to make changes to the address switch S1 p 6 at the receiver Even when using several gantry cranes in parallel only the...

Страница 18: ...lesquelles des aimants sont mis en place pour afficher la position de fin de course de la cabine de grue M me lorsqu il ne se trouve pas sous tension l lectro aimant est attir par ces aimants Wijzige...

Страница 19: ...isation de l metteur et du r cepteur Lors de la premi re mise en service ou bien lorsque le pupitre de commande doit tre r adapt au r cepteur la diode lec troluminescente de fonctionnement D2 sur le r...

Страница 20: ...e entsprechende Funktion ausgef hrt Ein gleichzeitiges Bet tigen beider Funktionen am Bedienkn ppel K1 ist nicht m glich Befindet sich der Lasthaken in seiner unteren Endposition so wird beim wei tere...

Страница 21: ...gher the speed at which the respective function will be performed If the load hook is in its lower end posi tion the rope is wound up in the oppo site direction when the Lower load hook function is tr...

Страница 22: ...de commande K1 et K2 de leur position centrale plus vous augmentez la vitesse de la fonction correspondante Lorsque le crochet de levage se trouve en posi tion de fin de course inf rieure le c ble s...

Страница 23: ...worden gezet des te sneller wordt de desbe treffende functie uitgevoerd Wanneer de lasthaak zich in de onderste eindpo sitie bevindt wordt bij verdere bedie ning van de functie Lasthaak vieren de kab...

Страница 24: ...from this mode back to the standard mode Autres commandes du pupitre de commande Le pupitre de commande dispose d un large ventail de fonctions de commande suppl mentaires qui ne sont pas exploit es...

Страница 25: ...ire surface Comportement du r cepteur en cas de court circuit En cas de court circuit au niveau de la grue portique le r cepteur coupe automatique ment l alimentation de la grue portique La tension d...

Страница 26: ...can no longer be used Raccordement de la grue portique directement la Control Unit 6021 Pour la grande majorit des mod listes la meilleure solution est le pilotage de la grue portique au moyen du pupi...

Страница 27: ...l adresse Un d codeur num rique se trouve respective ment dans la cabine de la grue et dans le pont roulant Au d part de l usine le d codeur dans la cabine est r gl sur l adresse 73 et celui du pont...

Страница 28: ...4 5 7 05 1 5 7 06 2 3 4 2 3 5 7 01 3 5 7 02 1 2 3 4 2 79 1 3 5 7 80 Empf nger Schalter S1 S 6 Decoder im Kranhaus Decoder in der Kranbr cke Receiver Switch S1 p 6 Decoder in crane cab Decoder in cran...

Страница 29: ...Control Unit 6021 ou de l appareil Control 80 f D codeur dans la cabine de la grue adresse de s rie 73 F1 activation du moteur pour d placer la cabine sur le pont roulant F2 aucune affectation F3 acti...

Страница 30: ...k l i n Wartung Maintenance Maintenance Onderhoud Achsen und Antrieb am Kranhaus len Nur sparsam len Oil axles and drive unit on the crane cab Oil only sparingly Huiler les axes et l entra nement de l...

Страница 31: ...f and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and...

Отзывы: