Revision 1.4.18
Page 173
Figure 191
– Intermediate Level Calibration
Once the tank is completely full, instead of pressing the
Accept
key to store the current calibration
point, press the
Complete
key. This will complete the calibration process and will also adjust the tank
capacity to the currently indicated level. Figure 192 below shows the calibration screen at the last
point with the full tank level (and thus the tank capacity) set to 101 gallons.
Figure 192
– Full Level Calibration
After you press accept, a confirmation screen will appear showing completion of the calibration
process and the new tank capacity value. A screenshot of this calibration screen is shown below in
Figure 193.
Содержание DSM150
Страница 16: ......
Страница 163: ...Revision 1 4 18 Page 147 Figure 153 RAA100 Setting the to Sender Gauge Resistance...
Страница 233: ...Revision 1 4 18 Page 217 Figure 254 Favorite Screen Showing Highlighted Switch Breaker...
Страница 263: ...Revision 1 4 18 Page 247 Figure 288 Restore Factory Defaults Confirmation...