Page 81
Version 2023-06-15
Fire damper - FDMR
TPM 140/19
Installation frame R6
■
Installation frames R6 is designed for installation without additional sealing of the penetration for:
■
Installation outside solid wall/ceiling construction with insulation from fire-resistant boards
Installation frame is equipped with an intumescent sealing on the inside. This sealing fills the gap between the damper
casing and frame in the event of a fire
■
Material:
■
Installation frame - cement-lime boards
■
Fasteners - galvanized steel
100
160
50
Ø
D+170
Ø
D+90
Installation frame R6