Fire damper - FDMR
TPM 140/19
In solid wall construction - installation next to the wall/ceiling - installation frame R1, R2
■
For connection of following duct
■
Installation frame can be installed on the damper or delivered separately
■
Installation procedure of the installation frame for FDMR
Installation frame R1 - solid wall th. 100 mm or solid ceiling th. 110 mm
■
Installation frame R2 - solid wall th. 150 mm or solid ceiling th. 150 mm
■
Conditions of this installation are also valid for the installation in Solid ceiling construction
■
Mineral wool is fixed to the wall construction and to the installation frame with fire-protective mastic
EIS 90
A
A
Ø
D
Ø
D+155
+3
(installation open-
ing
)
2
x
Ø
D
+
3
1
5
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
in
g
)
≥
100 (R1)
≥
150 (R2)
2
0
1
0
2
0
A-A
1
0
10
Ø
D+145
+3
(installation open-
ing
)
Ø
D
+
1
5
5
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
-
in
g
)
1
0
1
FDMR
2
Installation frame
3
Bracket with fasteners (delivered with frame)*
4
Fill the gaps with glue PROMAT K84
5
Solid wall construction
6
Mineral wool board - min. density 140 kg/m³ (e.g. PROMAPYR-T150)
7
Solid ceiling construction
8
Duct
9
Bracket L with fasteners (if required - must be specified in the order)
* Bracket with fasteners for 1 damper
FDMR diameter
Number of
brackets
Number of
screws
D ≤ 400
4
8
400 < D ≤ 800
8
16