Fire damper - FDMR
Page 78
Version 2023-06-15
TPM 140/19
≥
2
0
≥
1
0
Ø
D
Ø
D
+
1
0
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
in
g
)
X
4
x
Ø
1
2
≥ 20
A
A
≥
1
0
≥ 10
EIS 90
A-A
≥
100
Ø
D
110
X =
Ø
D+120
for dampers
Ø
D 100-200 mm
X =
Ø
D+167
for dampers
Ø
D 225-800 mm
■
For connection of following duct
■
Installation frame can be installed on the damper or delivered separately
■
Installation procedure of the installation frame for FDMR
■
Conditions of this installation are also valid for the installation in Solid ceiling construction
In gypsum wall construction - installation next to the wall/ceiling - installation frame R5
1
FDMR
2
Installation frame - apply HILTI CFS-S ACR mastic at the entire area and
glue it to the fire separating construction
3
Fill the gaps with glue PROMAT K84
4
Duct
5
Solid gypsum construction
6
Solid ceiling construction
7
Holes for fixing the frame with threaded rods or steel anchors (frame
fixing material not included)