28
Kleiss MCS7-2PVC System Manual
|
www.MainlineControlSystems.com
9.0 Plugging Operation:
Assemble the plugging spindle and drilling dome
together by screwing the threaded fastener into the
drilling dome.
Verify bottom o-ring is in place.
Connect the completion plug onto the plug
spindle. The connection is good when the detent
balls of the plug spindle grip the completion plug
and the metal pieces line up with the holes. You
will hear a positive click.
Fully retract the plug into the dome.