
22
Kleiss MCS7-2PVC System Manual
|
www.MainlineControlSystems.com
Connect the chute into the bottom of the stopping
tower.
(There is only one way to connect the chute
properly and that is to match the pin and hole. The
chute fits the tower properly if a “click” is heard
after insertion.)
Use the orange chute lock to unlock the chute
assembly and slide it over the exposed chute.
Install the chute adapter on the slide gate valve.
Attach the flow stopping tower onto the slide
gate valve. Turn the tower clockwise until some
resistance is experienced.
stopper
vent port
Position the stopping tower so stopper will be
inserted into the correct position.
(The stopper deploys out the opposite side of
which the by-pass / vent port is attached.)
When doing this, make certain the valve doesn’t
inadvertently turn.