
23
Kleiss MCS7-2PVC System Manual
|
www.MainlineControlSystems.com
Close the valve of the by-pass / vent port.
Open the slide gate valve and check for any leaks
in the stopping tower. Use leak soap if necessary.
Correct any blow-by or leaks before continuing
stopping operation.
Unlock the orange chute lock and lower the chute
into the pipeline.
Lock the chute assembly at this position. (The
chute is now in the correct position inside the
pipeline and you can commence inserting the
stopper into the pipeline.)