background image

Kleiss MCS7-2PVC System Manual

Flow Stopping System / 2” up to 7.5 psi

Flow Stopping System / 2” up to 7.5 psi

Содержание Kleiss MCS7-2PVC

Страница 1: ...Kleiss MCS7 2PVC System Manual Flow Stopping System 2 up to 7 5 psi Flow Stopping System 2 up to 7 5 psi...

Страница 2: ...gn safety factor of 3 The balance of the tools have a design safety factor of 2 5 The Kleiss MCS7 2PVC System is designed to handle flow control on pipe sizes up to 2 on PVC pipe See Section 4 0 to id...

Страница 3: ...7 2PVC System on non metallic lines please follow company procedures for grounding equipment for discharge of any static electricity 2 0 System Specifications 2 1 General 2 1 General A Pipe diameter 2...

Страница 4: ...m sec NOTE The system is designed to be used in controlled stop off applications and is not intended to be used to stop flows in severely ruptured pipes Flow should be reduced before attempting stop o...

Страница 5: ...the stopper as quickly as practical 4 Suggested stopper setting sequence is tower 1 2 3 4 Set all 4 stoppers 5 First inflated stopper is now in a no flow condition Reset stopper for best possible seal...

Страница 6: ...h sides of the stopper before deflation or removal 1 Deflate stoppers 2 and 3 2 Use by pass vent ports on tower 1 and 2 to equalize pressures on stoppers 1 and 4 Equalize slowly 3 Use by pass vent por...

Страница 7: ...w of gas 3 Always inflate the stopper as quickly as practical 4 Suggested stopper setting sequence is tower 3 4 2 1 Set all 4 stoppers 5 First inflated stopper is now in a no flow condition Reset stop...

Страница 8: ...moval 1 Deflate stopper 2 2 Back pressure stopper 4 through the system pressure ports in towers 3 and 4 3 Deflate stopper 4 4 Equalize pressure on stoppers 1 and 3 through the by pass vent port betwee...

Страница 9: ...e 15 16 23000096 MDS Stopper 1 96 2 16 50 mm 55 mm 17 99540010 Drilling Dome 2 1 2 18 12400245 Control Gauge Pipeline Pressure Between Tools 9 psi 19 10500050 Drilling Tool P900 PART DESCRIPTION 20 13...

Страница 10: ...s com Tapping Tool and Completion Tool Components Tapping Tool and Completion Tool Components Feed Tube Cutter Drilling Rod Tapping Device Lock Plugging Spindle Completion Plug Tapping Device Drilling...

Страница 11: ...Systems com Stopping Tool Components Stopping Tool Components Internal Stopper Inflation Pressure Gauge System Pipeline Pressure Gauge Stopping Tower MDS Stopper Chute Assembly By Pass Vent Port Chute...

Страница 12: ...anual www MainlineControlSystems com Fitting Completion Plug Completion Cap Fitting Completion Plug Completion Cap PART DESCRIPTION 1 96008230 PVC Fitting 2 Accessories Accessories PART DESCRIPTION 1...

Страница 13: ...lamp next to the fitting in the area where the stopper will be inflated Pressure test attached fitting per company standards and specifications 6 0 Tapping Operation With fitting and repair clamp if n...

Страница 14: ...e to the hot tapping device Attach the pilot drill to the drilling rod using an allen wrench Grease the rod with silicone grease for a smooth installation Then install the drilling rod through the hot...

Страница 15: ...he drilling dome the cutter should be in the position as shown in the picture Lock the drilling rod by operating the orange tapping device lock With slide gate valve open pulled out install the comple...

Страница 16: ...fter the pilot drill is in contact with the pipeline lock the drilling rod by operating the orange tapping device lock Rotate the feed tube counterclockwise until 3 additional threads are exposed This...

Страница 17: ...Unlock the drilling rod by operating the orange tapping device lock Then pull the drilling rod completely upwards above the slide gate valve If assistance to get the cutter out is needed turn the dril...

Страница 18: ...the slide gate valve When doing this make certain the valve doesn t inadvertently turn Disassemble the tapping tool NOTE When taking apart the tapping tool the cutter should contain the drilling coupo...

Страница 19: ...bottom of the gauge rod contains a seal The seal should be in good condition NOTE Extra gauge rod seals should always be available Never use the stopping tool if the seal is not inside the coupling V...

Страница 20: ...means of a pair of wrenches Always use two wrenches to ensure tight connection and seal Connect hand pump to the stopper inflation connection on the top end of the gauge rod This is the silver connec...

Страница 21: ...stopper into a piece of pipe within the stopper s pipe ID range Make certain the test set up is in a safe place where the open end of the test pipe is pointed away from people Inflate the stopper to t...

Страница 22: ...the stopper to slippery and may contain solvents Spray the back of the stopper at the conical connection Spray the front of the stopper around the nose Do NOT spray the body of the stopper Using the g...

Страница 23: ...chute lock to unlock the chute assembly and slide it over the exposed chute Install the chute adapter on the slide gate valve Attach the flow stopping tower onto the slide gate valve Turn the tower cl...

Страница 24: ...leaks in the stopping tower Use leak soap if necessary Correct any blow by or leaks before continuing stopping operation Unlock the orange chute lock and lower the chute into the pipeline Lock the chu...

Страница 25: ...indicating a pressure of 15 psi system pipeline pressure internal inflation pressure Attach hand pump and with inflation valve open inflate the stopper to 2 times system pressure Close the inflation v...

Страница 26: ...WAYS EQUALIZE PRESSURE Once pressure is equalized open the inflation valve of the MDS Stopper to deflate the stopper Pressure inside the pipeline will assist with the evacuation Connect the hand pump...

Страница 27: ...etracting the chute into the chute assembly and out of the pipeline NOTE Keep control of the chute assembly Lock the chute assembly by operating the orange chute lock Close the slide gate valve Open t...

Страница 28: ...rn Remove the chute from the stopping tool Push gauge rod to lowest position to expose the stopper connection and disconnect the MDS Stopper Clean and store MDS Stopper in transportation case Do not l...

Страница 29: ...r by screwing the threaded fastener into the drilling dome Verify bottom o ring is in place Connect the completion plug onto the plug spindle The connection is good when the detent balls of the plug s...

Страница 30: ...ng so make certain the plugging spindle is at the top of the dome Keep control of the spindle Open the slide gate valve With the plugging handle and your hand to support it push the plugging spindle f...

Страница 31: ...30 Kleiss MCS7 2PVC System Manual www MainlineControlSystems com After the plug seal has been verified pull the plug spindle fully upwards out of the completion plug Remove the dome from the valve...

Страница 32: ...etion cap inspect the completion plug again for any leakage Screw the completion cap onto the fitting Remove the repair clamp If desired repair clamp can be left on permanently but is not necessary af...

Страница 33: ...ease the tapping device if needed 10310800 Inspect gauges for any damage and ensure they are reading zero and function properly Inspect stopper rod for bends and or damage Check to make sure the gear...

Страница 34: ...ct the stopper for weak spots and integrity Discard stopper if weak spots are found Continue with inspection if everything looks OK OK Examples Coating is coming off but individual threads are not sho...

Страница 35: ...the condition of the stopper is still uncertain or additional stopper testing is desired insert the stopper into a piece of pipe within the stopper s pipe ID range Make certain the test set up is in...

Страница 36: ...e Side of Work Area Illustration of One Side of Work Area STOPPING TOWER DISTANCES Nominal Pipe Size A minimum B L1 Steel Welding L2 PE CI and Mechanical 2 A minimum distance between towers B stopper...

Страница 37: ...ion of One Side of Work Area Illustration of One Side of Work Area STOPPING TOWER DISTANCES Nominal Pipe Size A minimum B L1 Steel Welding L2 PE CI and Mechanical 2 A minimum distance between towers B...

Страница 38: ...of One Side of Work Area Illustration of One Side of Work Area STOPPING TOWER DISTANCES Nominal Pipe Size A minimum B L1 Steel Welding L2 PE CI and Mechanical 2 A minimum distance between towers B st...

Страница 39: ...n of One Side of Work Area Illustration of One Side of Work Area STOPPING TOWER DISTANCES Nominal Pipe Size A minimum B L1 Steel Welding L2 PE CI and Mechanical 2 A minimum distance between towers B s...

Страница 40: ...39 Kleiss MCS7 2PVC System Manual www MainlineControlSystems com 844 FLO STOP www MainlineControlSystems com V14...

Отзывы: