9.
Slowly close the platform and check that the vertical
rail tubes are parallel with the cab posts when viewing
from the rear.
Figure 3.92: Left-Hand Platform
10. Laterally adjust the king pin mounting (A) as required.
Figure 3.93: Left-Hand Platform – Main Beam
11. Ensure the rubber bumper (A) is contacting the frame.
Figure 3.94: Left-Hand Platform –
Rubber Bumper
147962
66
Revision A
Содержание M Series
Страница 2: ...Featuring the Dual Direction and Ultra Glide suspension on the M155 and M205 Published in August 2016 ...
Страница 5: ...Figure 2 EC Declaration of Conformity Windrower Lift Sling Page 2 of 2 147962 iii Revision A ...
Страница 7: ...Figure 4 EC Declaration of Conformity Windrower Assembly Supports Page 2 of 2 147962 v Revision A ...
Страница 10: ......
Страница 20: ......
Страница 33: ...UNLOADING THE WINDROWER 9 Unhook the remaining sling Figure 2 24 Platforms 147962 19 Revision A ...
Страница 40: ......
Страница 166: ......
Страница 332: ......
Страница 395: ......