CAUTION
To prevent damage to the lift system when lowering
header lift linkages without a header or weight
box attached to the windrower, ensure the float
engagement pin is installed in storage position (B)
and NOT in engaged position (A).
Figure 3.250: Header Float Linkage
CAUTION
Check to be sure all bystanders have cleared the area.
2.
Start the engine and activate the HEADER DOWN
button (A) on the ground speed lever (GSL) to fully
retract header lift cylinders.
IMPORTANT:
If the center-link is too low, it may contact the header
as the windrower approaches the header for hookup.
Figure 3.251: Ground Speed Lever
3.
Activate the REEL UP switch (A) on the GSL to raise
the center-link until the hook is above the attachment
pin on the header.
Figure 3.252: Ground Speed Lever
147962
134
Revision A
Содержание M Series
Страница 2: ...Featuring the Dual Direction and Ultra Glide suspension on the M155 and M205 Published in August 2016 ...
Страница 5: ...Figure 2 EC Declaration of Conformity Windrower Lift Sling Page 2 of 2 147962 iii Revision A ...
Страница 7: ...Figure 4 EC Declaration of Conformity Windrower Assembly Supports Page 2 of 2 147962 v Revision A ...
Страница 10: ......
Страница 20: ......
Страница 33: ...UNLOADING THE WINDROWER 9 Unhook the remaining sling Figure 2 24 Platforms 147962 19 Revision A ...
Страница 40: ......
Страница 166: ......
Страница 332: ......
Страница 395: ......