1.
Attach chains or cables to the four lifting points (A) on
the lift sling (MD #163871), and connect the loop ends
to the crane hook.
IMPORTANT:
Use cables or chains with a minimum lifting
capacity of 3221 kg (7100 lb.).
2.
Attach the lift sling to the four designated lifting points
on the windrower shipping frame as shown.
Figure 3.4: Shipping Frame Lifting Points
DANGER
To avoid injury or death from a swinging or
falling load, keep all bystanders clear when lifting.
Equipment used for lifting must exceed the maximum
requirements specified in this section.
3.
Lift the windrower onto the support stand (A).
4.
Remove chains from shipping frame and move lift
sling (B) clear of the work area.
Figure 3.5: Windrower on Support Stand
147962
29
Revision A
Содержание M Series
Страница 2: ...Featuring the Dual Direction and Ultra Glide suspension on the M155 and M205 Published in August 2016 ...
Страница 5: ...Figure 2 EC Declaration of Conformity Windrower Lift Sling Page 2 of 2 147962 iii Revision A ...
Страница 7: ...Figure 4 EC Declaration of Conformity Windrower Assembly Supports Page 2 of 2 147962 v Revision A ...
Страница 10: ......
Страница 20: ......
Страница 33: ...UNLOADING THE WINDROWER 9 Unhook the remaining sling Figure 2 24 Platforms 147962 19 Revision A ...
Страница 40: ......
Страница 166: ......
Страница 332: ......
Страница 395: ......