7.
Fit the beacon onto the base making sure the beacon
is oriented with the point on the lens facing forward
(cab-forward) as shown.
Figure 3.150: Beacon Light Orientation
8.
Mount the beacon to the base with the lock washers
and nuts (A) supplied with the beacon.
9.
Install the second beacon on the opposite side of the
cab roof.
Figure 3.151: Beacon Light
147962
95
Revision A
Содержание M Series
Страница 2: ...Featuring the Dual Direction and Ultra Glide suspension on the M155 and M205 Published in August 2016 ...
Страница 5: ...Figure 2 EC Declaration of Conformity Windrower Lift Sling Page 2 of 2 147962 iii Revision A ...
Страница 7: ...Figure 4 EC Declaration of Conformity Windrower Assembly Supports Page 2 of 2 147962 v Revision A ...
Страница 10: ......
Страница 20: ......
Страница 33: ...UNLOADING THE WINDROWER 9 Unhook the remaining sling Figure 2 24 Platforms 147962 19 Revision A ...
Страница 40: ......
Страница 166: ......
Страница 332: ......
Страница 395: ......