![Lumen Dynamics Group OmniCure LX400+ Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/lumen-dynamics-group/omnicure-lx400/omnicure-lx400_user-manual_1947995021.webp)
- 16 -
LX400+ UV LED Spot Curing System
4.
Installation Procedures
4.1
General Installation
Note:
Before any installation occurs ensure the controller key
is either removed from the unit or in the off position.
Note:
Prior to the following procedures it is determined that the
user has established the LED UV head location and
position based on the results of a series of testing and
trials.
Note: Refer to OmniCure® LED Head Assembly
Specification Guide 035-00433R for LED Head
specifications.
4.1.1
Upon determining the working location of the
controller, ensure access to the AC power source does
not cause any possible obstruction with the power
cable connection from the source to the controller.
4.1.2
Ensure the remote Safety Interlock is connected
before start-up as the LED light will not turn on. Refer
to
and section
4.1.3
Connect the LED UV head cable to the rear of the
controller via the quick release fittings.
4.1.4
Upon determining the working location of the LED UV
head, attach the head to the mounting fixture via user
supplied configuration or utilize the LDG supplied
installation clamp.
4.1.5
Install the supplied installation clamp to the existing
fixture using either the 3 metric threaded screw holes
or the 3 imperial threaded screw holes. The two end
faces of the installation bracket are identified for metric
and imperial thread sizes.