Lucent Technologies ECS Minicell Battery Plant H569-420
2 - List of Tables
Issue 5 February 1997
Table 5-C: Installation Reference Documents
Table 6-A: Controller Dip Switch Settings
Table 6-B: Controller Factory Default Settings
Table 6-C: CP2 Dip Switch Settings
Table 6-D: SW701 Settings for SR100/+24V Rectifier
Table 6-E: Figure/Feature Cross-Reference
Table 6-F: T83260-30 Figure H3 Alarm Lead Designation 6 - 5
Table 6-G: Recommended AC Fittings
Содержание H569-420
Страница 2: ......
Страница 7: ...Lucent Technologies ECS Minicell Battery Plant H569 420 2 List of Figures Issue 5 February 1997 ...
Страница 15: ...Lucent Technologies ECS Minicell Battery Plant H569 420 1 6 Introduction Issue 5 February 1997 ...
Страница 71: ...Lucent Technologies ECS Minicell Battery Plant H569 420 6 8 Installation Tables Issue 5 February 1997 ...
Страница 81: ...Lucent Technologies ECS Minicell Battery Plant H569 420 8 2 Spares Issue 5 February 1997 ...
Страница 85: ...Lucent Technologies ECS Minicell Battery Plant H569 420 9 4 Product Warranty Issue 5 February 1997 ...