The tables below provide additional information. Many of them
appear in other manuals and are duplicated here for your
convenience. In them, a “0” indicates an open switch setting and
a “1” indicates a closed switch setting.
Controller
Table 6-A: Controller Dip Switch Settings
SW 101
HV/EQ
SW 102
HV/FL
SW103-
BD
Switch Setting
-1
-2
-3
-4
-5
-6
+25.75V
+24.75V
+24.00V
1
0
1
1
1
1
+26.25V
+25.25V
+24.50V
0
0
1
1
1
1
+26.75V
+25.75V
+25.00V
1
1
0
1
1
1
+27.25V
+26.25V
+25.50V
0
1
0
1
1
1
+27.75V
+26.75V
+26.00V
1
0
0
1
1
1
+28.25V
+27.25V
+26.50V
0
0
0
1
1
1
+28.75V
+27.75V
+27.00V
1
1
1
0
1
1
+29.25V
+28.25V
+27.50V
0
1
1
0
1
1
+29.75V
+28.75V
+28.00V
1
0
1
0
1
1
+30.25V
+29.25V
+28.5V
0
0
1
0
1
1
Содержание H569-420
Страница 2: ......
Страница 7: ...Lucent Technologies ECS Minicell Battery Plant H569 420 2 List of Figures Issue 5 February 1997 ...
Страница 15: ...Lucent Technologies ECS Minicell Battery Plant H569 420 1 6 Introduction Issue 5 February 1997 ...
Страница 71: ...Lucent Technologies ECS Minicell Battery Plant H569 420 6 8 Installation Tables Issue 5 February 1997 ...
Страница 81: ...Lucent Technologies ECS Minicell Battery Plant H569 420 8 2 Spares Issue 5 February 1997 ...
Страница 85: ...Lucent Technologies ECS Minicell Battery Plant H569 420 9 4 Product Warranty Issue 5 February 1997 ...