![LS Industrial Systems XBL-EMTA Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/ls-industrial-systems/xbl-emta/xbl-emta_user-manual_1943817018.webp)
Chapter 3 Installation
17
3.2.4 Check points before start-up
The following describes check points before start-up communication module.
(1) Communication module
Check points
Installation and operation of XG5000, Performance and operation of XG-PD
Connection condition of communication cable (only the condition of connecting cable)
Module installation condition
[Table 3-3] Check points before start-up
(2) Start-up processing
It shows start -up from finishing installation of module on PLC.
Start
Power- ON :
1) Check power source
2) Check the connection of communication cable
3) Power- ON.
4) Check LED ‘ON’ of power supply
5) Check LED status on CPU module
-> If abnormal, refer to the troubleshooting contents of each PLC manual.
6) Check LED status (normal/abnormal) of communication module
-> If abnormal, refer to chapter 10. Troubleshooting of this manual.
7) Download after setting system parameter correctly
▼
Programming : Program at XG5000, Write on CPU module
▼
Sequence check :
Check module operation by program
▼
Program correction :
Do correct if sequence program has problem
▼
Saving program:
1) Save program in floppy disc or hard disc.
2) Print out circuit diagram and list by printer.
End