background image

1 2

TNR-I&S-02

4. Partially assemble vent kit by performing the following:

a. Cement concentric Y fitting to larger diameter pipe.  (See Figure

18).

b. Cement rain cap to smaller diameter pipe. (See Figure 19).

5. Install concentric Y fitting and pipe assembly through the structure’s

hole and field-supplied roof boot/flashing.  Do not allow insulation or
other materials to accumulate inside pipe assembly when installing
through the hole.

6. Secure assembly to roof structure as shown in (Figure 20) using field-

supplied metal strapping or equivalent support material.

7. Install rain cap and small diameter pipe assembly in roof penetration

assembly.  Ensure small diameter pipe is cemented and bottomed in
Y concentric fitting.

8. Cement heater combustion-air and vent pipes to concentric y fitting

assembly (Figure 18).  (See Figure 20) for proper pipe attachment.

9. Operate heater through one cycle to ensure combustion-air and vent

pipes are properly connected to concentric vent termination
connections.

Horizontal Installation:

1. Become familiar with coaxial vent kit. As shown in Figures 17 through

19.

2. Determine the best location for the termination kit.

3. Cut the recommended 5" diameter hole.

4. Partially assemble vent kit.

a. Cement Y concentric fitting to larger diameter kit pipe.  (See Figure

18).

b. Cement rain cap to smaller diameter kit pipe. (See Figure 19).

5. Install  concentric Y fitting and pipe assembly through the structure’s

hole and field-supplied roof boot/flashing.  Do not allow insulation or
other materials to accumulate inside pipe assembly when installing
through the hole.

6. Install rain cap and small diameter pipe assembly in concentric Y

fitting and large pipe assembly.  Ensure small diameter pipe is cemented
and bottomed in concentric Y fitting.

7. Secure assembly to structure as shown in Figure 21.  Ensure clearances

as shown in Figure 21.

8. Cement heater combustion-air and vent pipes to concentric Y fitting

termination assembly.  (See Figure 21) for proper pipe attachment.

9. Operate heater through one cycle to ensure combustion-air and vent

pipes are properly connected to concentric vent termination
connections.

 

Figure 19

   Rain Cap to Small Vent Pipe Ass’y

NOTICE

Ensure termination height is above the roof surface or anticipated
snow level.  Figure 20. If assembly is too short to meet height
requirements, the 2 pipe supplied in the kit may be replaced by using
the same diameter pipe. DO NOT extend the overall dimension by
more than 60 in.  (See Figure 17).

 

Figure 20

Concentric Vent Roof Top Attachment

NOTICE

Position termination where vent vapors will not damage plants/shrubs
or air conditioning equipment.
Position termination where vent vapors will not be adversely effected
by wind condition.
Position termination where it will not be damaged or be subjected to
foreign objects.
Position termination where vapors will not be objectionable.

Содержание TNR-I&S-02

Страница 1: ...perature and pressure relief valve complies with local codes If the combination temperature and pressure relief valve does not comply with local codes replace it with one that does Install a discharge...

Страница 2: ...ions will be short and direct 2 THIS WATER HEATER IS SUITABLE FOR INSTALLATION ON COMBUSTIBLE FLOOR DO NOT install this water heater on carpeting 3 FOR BASEMENT INSTALLATION provide a solid level elev...

Страница 3: ...pening is to be located within twelve 12 inches of the enclosure top and the bottom opening within twelve 12 inches of the enclosure bottom Each opening shall have a free area of at least one square i...

Страница 4: ...the time it is open Keep clear of the combination temperature and pressure relief valve discharge line outlet The discharge may be hot enough to cause scald injury The water is under pressure and may...

Страница 5: ...injuy and may be used as a guide in determining the safest water temperature for your applications ALTERNATE SPACE HEATING WATER CONNECTIONS Connect the system supply and return piping to the water he...

Страница 6: ...on instructions Water heater must be protected from freezing downdrafts during shutdown periods Provide protection of the building materials from degradation by flue gases from the exhaust vent termin...

Страница 7: ...IONS FOR INSTALLATIONS The vent terminal must not terminate 1 Directly above a paved sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings 2 Less th...

Страница 8: ...de wall if vented on the same wall 2 Use the proper PVC cement to secure the 90 exhaust vent and air intake terminals provided with the water heater to the plastic pipes The distance between the back...

Страница 9: ...0 elbow referred to as the exhaust vent terminal and the air intake terminal Power Vent Terminal Location Refer to the Direct Vent Terminal Location see page 7 section previously mentioned to determin...

Страница 10: ...tical run and every 3 feet of horizontal run of vent pipe length Stress levels in the pipe and fittings can be significantly increased by improper installation If rigid pipe clamps are used to hold th...

Страница 11: ...other appliance Using this kit on other appliances and or water heaters can result in property damage personal injury or death DO NOT operate this water heater until the installation and assembly of t...

Страница 12: ...pipe See Figure 19 5 Install concentric Y fitting and pipe assembly through the structure s hole and field supplied roof boot flashing Do not allow insulation or other materials to accumulate inside p...

Страница 13: ...7 Take the time and effort to do a professional job Shortcuts will only cause you problems and delays in start up The majority of failures in these systems are the result of shortcuts and or improper...

Страница 14: ...any damage or injury caused as a result of a cracked gas inlet as a result of excessive torque This water heater and its gas connection must be leak tested before placing the water heater in operatio...

Страница 15: ...at satisfied 4 Blower pre purge 9 Main burner OFF 5 Igniter warm up 10 Blower post purge WARNING Water heaters are heat producing appliances To avoid damage or injury there must be no materials stored...

Страница 16: ...1 6 TNR I S 02 LIGHTING INSTRUCTIONS Figure 24 Lighting Instruction Label...

Страница 17: ...mperature during standby periods Lower water temperatures also extend tank life Remember no water heating system will provide exact temperatures at all times Allow a few days of operation at this sett...

Страница 18: ...em Condensate Line OPERATION Sediment Removal Inspect Check Operation Clean Inlet Screen Inspect Inspect Free of Shrubs Debris Inspect Inspect INTERVAL Monthly Semi Annually Semi Annually As Required...

Страница 19: ...sion Replace with a new valve of the recommended size as necessary A thorough inspection of the valve should be performed at least every three years by removing the temperature and relief valve from t...

Страница 20: ...illed with condensate then replace pressure switch If filled empty hose Is the Collector Limit Switch N C If no then reset switch If this switch trips more than 3 times call service If all items above...

Отзывы: