- 24 -
2) Connection of Pipings (7K,9K BTU)
1. Remove the installation plate.
• Pull the two '
'marked portion of bottom of the
chassis and pull the installation plate out of
chassis.
2. Route the drain hose and the indoor tubing.
For right rear piping
3. Insert the pipings, the connecting cables and
the drain pipe throught the piping hole on the
wall.
4. Connect the pipings and the indoor tubing, and
drain hose and drain pipe.
• Do not connect the cable to the indoor unit.
• Wrap the insulation material around the
connecting portion.
• Glue up the connection portion of drain hose and
drain pipe.
Pull
Pull
Installation Plate
;
;
;
Connecting cable
Drain pipe
Connecting piping
Indoor
Outdoor
Indoor unit tubing
Flare nut
Spanner
Torque wrench
Plastic Bands
Insulation material
Pipings
Drain Hose
Drain Pipe
Adhesive
Pipe Size
Torque
Liquid Side (1/4")
1.8kg.m
Gas Side (3/8")
4.2kg.m
Содержание LS-B0760CM/B0760HM
Страница 59: ... 59 Schematic Diagram 7K 9K 11K 12K 14K BTU Cooling Only Series ...
Страница 60: ... 60 7K 9K 12K BTU Cooling Heating Series ...
Страница 71: ...P NO 3828AR7036F Printed in Korea ...