2.6.2 Essential points of testing
The key to successful testing is strict adherence to the following procedure:
a) The liquid and gas piping in each refrigerant system should be pressurized in turn in accordance with the following
steps. (Nitrogen gas must be used.)
Increasing the system pressure to 3.8MPa(551.1psi) does not guarantee the identification of minor leaks if pressure is main-
tained for only a short time. It is therefore recommended that the system remain pressurized in accordance with Step 3
above for at least 24 hours.
Example:
During of pressurizing: 3.8MPa(551.1psi) at 25(77) ℃(℉)
24 hours later: 3.75MPa(543.9psi) at 20(68) ℃(℉)
Although the gauge pressure is dropped from 3.8MPa(551.1psi) to 3.75MPa(543.9psi), it can be safely assumed that
there is no leakage because the gauge pressure can also drop due to the change in outdoor temperature.
Step 1: increase pressure to 0.3MPa(43.5psi) for 3 minutes or more
Step 2: increase pressure to 1.5MPa(217.6psi) for 3 minutes or more
Step 3: increase pressure to 3.8MPa(551.1psi) for approxmate 24 hours
Indicates existence of major leaks
Indicates existence of major leaks
Piping should not be pressured more than 3.8MPa(551.1psi).
b) Check for pressure drop
If there is no drop in pressure then the test is deemed a success.
If the pressure drops then the leak must be located. See following page.
However, if there is a change in the ambient temperature between the pressurizing stage and the time when you check
for a drop in pressure then you will have to adjust your calculations accordingly since a change of 1℃(1.8℉) can
account for a pressure change of approximately 0.01MPa(1.45psi).
Compensating adjustment value:
(temperature at time of pressurizing – temperature at time of checking)
×
0.01(1.45)
NOTE
3.8(551.1)
3.75(543.9)
3.5(507.6)
3.0(435.1)
2.5(362.6)
2.0(290.1)
1.5(217.6)
1.0(145.0)
0.5(72.5)
0.0(0.0)
3 minutes
5 minutes
24 hours
Step 1 0.3MPa(43.5psi) x 3min
Step2 1.5MPa(217.6psi) x 5min
Step 3 3.8MPa(551.1psi) x 24Hr
MPa(psi)
(Time)
25(77) ℃(℉)
20(68) ℃(℉)
15(59) ℃(℉)
Outdoor temperature(°C(°F)
(
2. Guideline for each installation process
28
_
Heat pump 60Hz/R410A
Installation of
Outdoor Units
SINGLE ZONE
Содержание ATNH24GPLE2
Страница 1: ...SINGLE ZONE Heat pump 60Hz R410A 6CSL0 01B Replaces 6CSL0 01A ...
Страница 2: ...SINGLE ZONE General Information Indoor Units Outdoor Units Design and installation ...
Страница 5: ...SINGLE ZONE Part 1 General information 1 Model Line up 2 Nomenclature 3 Individual Control System ...
Страница 9: ...SINGLE ZONE Part 2 Product data n Indoor units n Outdoor units ...
Страница 14: ...Indoor Units 4 _ Heat pump 60Hz R410A 1 Ceiling cassette 4 way SINGLE ZONE TM Chassis ATNH42GMLE2 LCN427HV ...
Страница 26: ...Outdoor Units 6 _ Heat pump 60Hz R410A 1 DC Inverter SINGLE ZONE SINGLE ZONE U3 Chassis AUUW42GD2 LUU427HV ...