1.1 Installation process & Guideline
Striking a balance between system installation & general construction work.
1. The division of the work should be thoroughly clarified.
2. keep a constant check on the progress of the construction work to avoid deviations from the air condition-
ing work schedule.
Preparation of
contract drawing
Fitting of steel sleeves
Moulding box and
reinforcement work
Sleeve and insert work
Removal moulding boxes
Installation of indoor unit
Construction work
Air conditioning work
Refrigerant piping work
Drain piping work
Duct work
Insulation work
Electrical work
Ceiling preparations
Building rooftop
Outdoor unit foundation work
Installation of outdoor unit
Air tight test
Vacuum drying
Additional charge of refrigerant
Fit decoration panels
Cleaning inside and outside
Test run
T.A.B and final report
Energization
Transfer to customer with
explanation
Setting sleeve and insert work details
1. General installation guideline
Heat pump 60Hz/R410A
_
1
Installation of
Outdoor Units
SINGLE ZONE
Содержание ATNH24GPLE2
Страница 1: ...SINGLE ZONE Heat pump 60Hz R410A 6CSL0 01B Replaces 6CSL0 01A ...
Страница 2: ...SINGLE ZONE General Information Indoor Units Outdoor Units Design and installation ...
Страница 5: ...SINGLE ZONE Part 1 General information 1 Model Line up 2 Nomenclature 3 Individual Control System ...
Страница 9: ...SINGLE ZONE Part 2 Product data n Indoor units n Outdoor units ...
Страница 14: ...Indoor Units 4 _ Heat pump 60Hz R410A 1 Ceiling cassette 4 way SINGLE ZONE TM Chassis ATNH42GMLE2 LCN427HV ...
Страница 26: ...Outdoor Units 6 _ Heat pump 60Hz R410A 1 DC Inverter SINGLE ZONE SINGLE ZONE U3 Chassis AUUW42GD2 LUU427HV ...