Lenze · Decentralised frequency inverter 8400 motec (POWERLINK Option) · EDS84DMOTPL EN 1.0 - 11/2018
25
Commissioning
Before initial switch-on
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6
Commissioning
During commissioning, system-related data such as motor parameters, operating parameters,
responses, and parameters for fieldbus communication are defined for the inverter. For Lenze
devices, this is done via the codes.
The codes of the inverter and communication are saved non-volatilely as a data set in the memory
module.
In addition, there are codes for diagnosing and monitoring the stations.
The data from the inverter or the memory module can only be read with the main voltage supply
(400/500 V AC).
6.1
Before initial switch-on
Stop!
Before switching on the inverter for the first time, check the entire wiring with regard to
completeness, short circuit, and earth fault.
Содержание POWERLINK E84DGDV Series
Страница 69: ...69 ...