Installation
18
Lenze · Decentralised frequency inverter 8400 motec (POWERLINK Option) · EDS84DMOTPL EN 1.0 - 11/2018
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5
Installation
Stop!
Electrostatic discharge
Electronic components within the Communication Unit can be damaged or destroyed by
electrostatic discharge.
Possible consequences:
• The Communication Unit is defective.
• Fieldbus communication is not possible or faulty.
• I/O signals are faulty.
• The safety function is faulty.
Protective measures
Discharge electrostatic charges before touching the Communication Unit.
Содержание POWERLINK E84DGDV Series
Страница 69: ...69 ...