Step 2. Grasp the handle and slide the drive out of the drive bay.
Figure 19. Hot-swap drive removal
Step 3. Check the status of the RAID array to verify that slot 5 is empty:
#
# //u
ussrr//ssh
haarree//ttaaccp
p//lleen
no
ovvo
o//ttaaccp
p--n
nvvm
mee--cco
on
nttrro
oll..p
pyy --d
diissp
pllaayy
Following is an example output:
discovering NVMe disks. this operation will take a few seconds.
Chassis UUID: 500e0eca08057b00
Number of canisters: 2
This is the bottom (primary) canister and has the controller id 33
The top (secondary) canister has the controller id 34
This chassis has the following controller ids: 33 , 34
NVMe devices: 7
----------------
NVMe control device: /dev/nvme0
Slot: 8
Manufacturer: SAMSUNG MZWLL800HEHP-00003
Serial number: S3HCNX0JC02194
Firmware: GPNA9B3Q
Capacity: 800166076416 bytes 800.166076416 GB
Drive Temp: 42 C
Drive Health: Ok
Total namespaces: 1
Namespace id(s): 1
Namespace 1 size: 794996768768 bytes, 794.996768768 GB
Namespace 1 is attached to controller id(s): 33
Part replacement and maintenance procedures
53
Содержание ThinkAgile CP
Страница 4: ...ii Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Страница 6: ...iv Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Страница 8: ...vi Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Страница 30: ...22 Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Страница 33: ...Chapter 4 Managing Support Mode 25 ...
Страница 80: ...72 Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Страница 158: ...150 Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Страница 160: ...152 Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Страница 161: ......
Страница 162: ......