touch points on hot-swap components.) See the instructions for removing or installing a specific hot-swap
component for any additional procedures that you might have to perform before you remove or install the
component.
• The Red strip on the drives, adjacent to the release latch, indicates that the drive can be hot-swapped if
the server and operating system support hot-swap capability. This means that you can remove or install
the drive while the server is still running.
Note:
See the system specific instructions for removing or installing a hot-swap drive for any additional
procedures that you might need to perform before you remove or install the drive.
• After finishing working on the server, make sure you reinstall all safety shields, guards, labels, and ground
wires.
System reliability guidelines
Review the system reliability guidelines to ensure proper system cooling and reliability.
Make sure the following requirements are met:
• When the server comes with redundant power, a power supply must be installed in each power-supply
bay.
• Adequate space around the server must be spared to allow server cooling system to work properly. Leave
approximately 50 mm (2.0 in.) of open space around the front and rear of the server. Do not place any
object in front of the fans.
• For proper cooling and airflow, refit the server cover before you turn the power on. Do not operate the
server for more than 30 minutes with the server cover removed, for it might damage server components.
• Cabling instructions that come with optional components must be followed.
• A failed fan must be replaced within 48 hours after malfunction.
• A removed hot-swap fan must be replaced within 30 seconds after removal.
• A removed hot-swap drive must be replaced within two minutes after removal.
• A removed hot-swap power supply must be replaced within two minutes after removal.
• Every air baffle that comes with the server must be installed when the server starts (some servers might
come with more than one air baffle). Operating the server with a missing air baffle might damage the
processor.
• All processor sockets must contain either a socket cover or a processor with heat sink.
• When more than one processor is installed, fan population rules for each server must be strictly followed.
Working inside the server with the power on
Guidelines to work inside the server with the power on.
Attention:
The server might stop and data loss might occur when internal server components are exposed
to static electricity. To avoid this potential problem, always use an electrostatic-discharge wrist strap or other
grounding systems when working inside the server with the power on.
• Avoid loose-fitting clothing, particularly around your forearms. Button or roll up long sleeves before
working inside the server.
• Prevent your necktie, scarf, badge rope, or hair from dangling into the server.
• Remove jewelry, such as bracelets, necklaces, rings, cuff links, and wrist watches.
• Remove items from your shirt pocket, such as pens and pencils, in case they fall into the server as you
lean over it.
• Avoid dropping any metallic objects, such as paper clips, hairpins, and screws, into the server.
.
57
Содержание 7X69
Страница 1: ...ThinkSystem SR860 Setup Guide Machine Type 7X69 and 7X70 ...
Страница 8: ...vi ThinkSystem SR860 Setup Guide ...
Страница 62: ...54 ThinkSystem SR860 Setup Guide ...
Страница 69: ...Chapter 3 Server hardware setup 61 ...
Страница 82: ...74 ThinkSystem SR860 Setup Guide ...
Страница 108: ...100 ThinkSystem SR860 Setup Guide ...
Страница 162: ...154 ThinkSystem SR860 Setup Guide ...
Страница 166: ...158 ThinkSystem SR860 Setup Guide ...
Страница 170: ...video connector front 15 rear 21 23 W working inside the server power on 57 162 ThinkSystem SR860 Setup Guide ...
Страница 171: ......
Страница 172: ...Part Number SP47A30799 Printed in China 1P P N SP47A30799 1PSP47A30799 ...