Operation
74
Push the locking pieces (5) onto the
drawbar (1).
Ensure that the side with the support
surface (7) is facing the rail plate (6).
Push the drawbar (1) through the bores
until the two ends of the drawbar (1) on
the left and right are the same distance
from the rail plates (6).
Push the locking pieces (5) up to the rail
plates (6).
Ensure that the support surfaces (7) are
positioned on the stop (8) of the rail
plates (6).
Tighten the nuts (3) on the bolts (4) to a
tightening torque of 197 Nm.
11.5 Additional
weights
Additional weights can be mounted in or-
der to improve the infeed of the implement
in challenging soil conditions.
Release the nuts (1) and (2).
Pull the rod (3) out of the bore in such a
way that the additional weight(s) can be
pushed onto the rod (3).
Align the additional weights centrally and
place them on flat steel bar (4).
To fix the weights, tighten the nuts (1)
and (2) to a torque of 926 Nm.
3
2
1
4
6
4
7
8
5
7
8
4
2
3
1
Содержание Heliodor 8
Страница 2: ......
Страница 20: ...Safety measures and precautions 18 3 4 3 Position of safety and warning signs Heliodor 8...
Страница 21: ...Safety measures and precautions 19 Heliodor 8 K...
Страница 25: ...Safety measures and precautions 23 Heliodor 8 K 3 6 2 Hazardous area when folding the implement in and out...
Страница 80: ...Uncoupling the implement 78 the protective caps Carefully drive the tractor away from the implement...
Страница 103: ...Index 101...