2009-2013
FLH
RENEGADE
2011+ Models
NOTE: If all original components of H-D swingarm are in good working order, they may be re-
used.
1. Press bearing assemblies out of HD swingarm using appropriate press collar. Refer to HD service
manual.
NOTE: Make sure swingarm bore is clean where bearing will be pressed in.
2. Press bearings into Lehman swingarm following H-D service manual procedure (H-D tool # HD-
45327). H-D tool will set bearings at correct location in Lehman swingarm collar.
3.
See Fig. 1 & Fig 2 on previous page
. Swingarm reinforcement bushings (S001346-LH, S001347-
RH & S001661).
4.
See Fig. 4.
Install RH swingarm reinforcement bushings (S001347 & S001661) into original rubber
mounts. Be sure to align offset in mount and bushings.
5. Install Lehman swingarm with word “TOP” (stamped into swingarm collar) facing upward.
6.
See Fig. 4
. Assemble parts for LH side (S001346 & S001661) as shown.
7.
See Fig. 4
. Re-install LH swingarm fork bracket. Apply Loctite 242 and torque bolts to
55 ft.-lbs.
8. Apply Loctite 242 to pivot shaft bolts and install. Torque swingarm pivot shaft bolts to
55 ft.-lbs
.
9.
See Fig. 4
. Discard OEM black plastic pivot shaft plugs and replace with S001662 chrome caps.
NOTE: Refer to H-D service manual for swingarm installation procedures and torque specifi
cations for specific model of motorcycle.
10. Verify swingarm assembly moves freely with no side to side play. Light resistance when moving up
and down is normal.
Fig. 4
INSTALLING LEHMAN SWINGARM
12