System operation
401
Start up
After the Herytage UPS has been completely installed and wired, the system may be started.
Follow appropriate start-up instructions listed below.
401-1
Soft-wired units (Line-cord and receptacle)
1.
2-4K units; connect DC connector to battery cabinet and proceed to step 2.If it
is a 6-20K unit and has internal batteries, turn on the DC breaker inside the
front door of the UPS. If unit has external batteries with a DC breaker / pre-
charge as part of system, press pre-charge button for 5 seconds and turn on
DC breaker
2.
Plug the line cord of the Herytage UPS into wall receptacle.
3.
Turn key-switch to
ON
position; rocker switch on 2 thru 4K products.
The green AC line LED should illuminate indicating commercial power is
available to the Herytage UPS. If the green LED does not illuminate call Legacy
Power Conversion customer service for assistance.
4.
Plug your load equipment into the Herytage UPS and turn on your equipment.
Note: there may be a breaker switch on UPS supplied receptacles.
5.
Program Parameters 23 Date and 24 Time to the correct date and time. If the
UPS has external batteries, program Parameter 44 Runtime D to the proper
value. Verify that Parameter 34 Charger Mode is programmed to 1 (on).
See section 500 of this manual for more details on lights, keypad, and display
functions. If red alarm LED turns on, call Legacy Power Conversion customer service.
Note:
For Herytage UPS, full runtime may not be available until batteries have
charged for 24 hrs.