![Leader Evaporator Springtech EXTREME 6 Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/leader-evaporator/springtech-extreme-6/springtech-extreme-6_manual_1864740048.webp)
Leader
Evaporator
Springtech
EXTREME
6
Reverse
Osmosis
System
Manual
Page:
48
4.
Place
the
two
clamp
halves
over
the
rubber
seal
and
aligning
the
pieces
with
the
grooves
in
the
connector
pipes.
Place
the
bolts
in
the
clamp
and
tighten.
Check
to
ensure
the
clamp
is
properly
seated
and
tightened
by
ensuring
the
two
halves
fit
tightly
together.
5.
Securely
tighten
the
nuts
and
bolts
of
the
membrane
housing
cap.
It
is
recommended
the
bolts
be
tightened
in
a
crisscross
pattern.
6.
Reconnect
the
permeate
line
at
left
end
of
the
membrane
housing
using
the
quick
coupler.
7.
Follow
the
instructions
for
the
Beginning
of
Season
Startup
(see
page
49).
Daily
Each
day,
it
is
recommended
the
following
be
done:
1.
Remove,
clean
and
reinstall
the
strainer
in
the
Y
‐
strainer.
2.
Sample
the
permeate
liquid
from
each
of
the
sampling
ports;
a.
Purge
the
permeate
sample
lines
by
running
the
system
and
drawing
a
volume
of
permeate
from
each
port
approximately
equal
to
a
test
cup.
b.
Draw
a
sample
for
testing.
Test
the
permeate
sugar
level
using
either
a
refractometer
or
a
hydrometer.
c.
If
the
results
indicate
there
is
any
sugar
present
there
is
a
possible
problem
with
the
membrane
O
‐
rings,
connector
or
alignment
couplings.
Check
the
troubleshooting
chart.
3.
Check
all
hoses,
piping,
fittings
and
connections
for
leaks.
Repair
as
necessary.
Содержание Springtech EXTREME 6
Страница 24: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 24...
Страница 54: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 54 ATTACHMENT 1 ELECTRICAL SCHEMATIC...
Страница 55: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 55...