Leader Evaporator Springtech EXTREME 6 Скачать руководство пользователя страница 44

 

Leader

 

Evaporator

 

Springtech

 

EXTREME

 

6

 

Reverse

 

Osmosis

 

System

 

Manual

      

Page:

 

44

 

 

Insert

 

the

 

clamp

 

assembly

 

half

 

without

 

the

 

bolts

 

into

 

the

 

brine

 

seal

 

groove.

 

 

 

 

2.

 

Place

 

a

 

second

 

membrane

 

on

 

a

 

clean

 

solid

 

surface

 

with

 

the

 

brine

 

seal

 

down.

 

 

 

3.

 

Insert

 

the

 

membrane

 

coupler

 

into

 

the

 

end

 

of

 

the

 

membrane.

 

 

 

 

4.

 

Insert

 

the

 

clamp

 

assembly

 

half

 

into

 

the

 

groove

 

at

 

the

 

top

 

portion

 

of

 

the

 

membrane

 

with

 

the

 

bolts

 

pointed

 

up.

 

 

 

 

 

 

5.

 

Using

 

a

 

marker,

 

mark

 

the

 

outside

 

edge

 

of

 

the

 

clamp

 

end

 

of

 

each

 

membrane

 

where

 

two

 

adjoining

 

support

 

fins

 

meet

 

the

 

outer

 

rim.

   

 

 

 

 

6.

 

Place

 

the

 

membrane

 

with

 

the

 

clamp

 

assembly

 

half

 

with

 

no

 

bolts

 

onto

 

the

 

other

 

membrane

 

aligning

 

as

 

follows;

 

a.

 

Center

 

over

 

the

 

connector

 

b.

 

Clamp

 

openings

 

to

 

be

 

on

 

opposite

 

sides

 

of

 

the

 

assembly

 

c.

 

Fin

 

marks

 

to

 

be

 

aligned

 

 

Содержание Springtech EXTREME 6

Страница 1: ...Leader Evaporator Co Inc 49 Jonergin Drive Swanton VT 05488 Tel 802 868 5444 www leaderevaporator com EXTREME 6 Reverse Osmosis System...

Страница 2: ...OWER REQUIREMENTS 12 GENERAL CONNECTION LAYOUT 13 Simple 3 Tank RO Diagram 13 STRAINER TO VALVE V6 CONNECTION 14 VESSEL PUMP PRE FILTER CANISTER AND WASH TANK DRAINS 14 V3 V4 AND V19 CONNECTIONS 17 V1...

Страница 3: ...Rod Clamped Membranes 42 Installation 43 Steps for Installa on of Brine Seal Clamped Membranes 43 Steps For Installa on of Threaded Rod Clamped Membranes 45 Common Steps for Installation 47 DAILY 48...

Страница 4: ...ap incoming to the reverse osmosis system Feed Pump The initial pump designed to supply the reverse osmosis unit with sap and maintain pressure in the system Pressure Pump The pump designed to provide...

Страница 5: ...two membranes There are a number of these membrane units attached around the outside of the permeate tube Between each of the membrane units is a spacer through which the sap and concentrate can flow...

Страница 6: ...d and built using the same principles of superior quality applied to our evaporators The LEADER EVAPORATOR Springtech EXTREME Reverse Osmosis System is covered by a manufacturer s warranty See ATTACHM...

Страница 7: ...re Pump Second stage of pressurizing the system required to process the sap through the membranes Recirculation Pumps Recirculates liquid within the vessel to which they are attached Feed Pump Feed Pu...

Страница 8: ...can be part of normal operations The machine will shut down when the indicator light is activated High Temperature Alarm indicates the Wash cycle has completed This alarm is part of normal operations...

Страница 9: ...ough V1 and V2 Valves V1 controls the pressure to the membranes It is opened way when starting then adjusted to reach the pressure wanted Close V1 to raise the pressure in the system V2 controls the f...

Страница 10: ...Wash Tank to Feed Pump V18 2 Way HANDLE POINTED HORIZONTAL No Flow HANDLE POINTED DOWN Membranes to Valve V19 V19 3 Way HANDLE POINTED HORIZONTAL Membranes to Wash Tank HANDLE POINTING VERTICAL Membra...

Страница 11: ...ION PHOTO ITEM LEADER ORDER DESCRIPTION PHOTO Membrane Preservative 1 lb 70001 RO Soap 5 Lbs 69992 Citric Acid 1 lb 70008 Glycol 1 gal 70009 20 Cartridge Filter 70012 Food Grade Grease 55095 Digital R...

Страница 12: ...ly it will need to have adequate ventilation during operations to prevent overheating The dimensions of the main system unit are Width 34 Length 109 Height 70 A minimum of two feet around the system i...

Страница 13: ...he location other arrangements are likely It is beyond the scope of this document to recommend the best layout for all situations It is recommended you contact your LEADER EVAPORATOR sales person or y...

Страница 14: ...When installing make the connection from the strainer to valve V6 Y Strainer Reducing adapter Vessel Pump Pre Filter Canister And Wash Tank Drains The drains are located 1 under each pressure vessel...

Страница 15: ...under the feed pump 1 under the pressure pump 1 under recirculation pump 2 Recirculation pump 1 will drain through the pressure pump drain Recirculation pump 3 will drain through recirculation pump 2...

Страница 16: ...inless steel ball valve To setup the drain you will need items not included 1 1 Stainless Steel band clamps 1 piece of 1 hose long to connect to the drain adapter and to reach the collection point 2 T...

Страница 17: ...e onto the 1 C style quick coupler 4 Position the stainless steel band clamp s over the hose on the coupler and tighten the band clamp s 5 Secure the other end of the hose to the drain connection 6 Co...

Страница 18: ...the hose 3 Slide the hose onto a 1 C style quick coupler 4 Position the stainless steel band clamp s over the hose on the adapter and tighten the band clamp s 5 Secure the other end of the hose to the...

Страница 19: ...NOTE Breakers are not shown in the correct position BREAKER ID CIRCUIT START POSITION CB1 Feed Pump ON CB2 Pressure Pump OFF CB3 Recirculation Pump OFF CB4 Recirculation Pump OFF CB5 Recirculation Pu...

Страница 20: ...2 for the data sheet format The following data is recorded Date date the information is collected Activity Concentration cycle enter a C or Test enter a T Sap the sugar concentration of the raw sap Co...

Страница 21: ...the end of each days use whichever comes first Rinse Run after the Desugar cycle Wash Chemical wash after a rinse A chemical wash should be run after 6 hours of concentrating OR at the end of every da...

Страница 22: ...r Data Sheet and write it in the field labelled Machine Serial 4 In the field labelled Vessel Location fill in the location of the vessel to be tracked Vessels are numbered from the bottom of the syst...

Страница 23: ...nchmark rates If the measured difference see the calculation below is 15 or more then further cleaning will be necessary See the flow chart on page 24 To calculate the difference to the benchmark do t...

Страница 24: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 24...

Страница 25: ...n minimum way then adjust Open minimum way then adjust Open Fully Open Fully V3 Handle Points Horizontal Handle Points Horizontal Handle Points Vertical Handle Points Vertical V4 Handle Points Vertica...

Страница 26: ...w to set the V1 and V2 valves Concentrate Preferred Turn V1 to a minimum pressure and turn V2 until the desired concentration is obtained Adjust V1 until the pressure desired is reached Readjust V2 un...

Страница 27: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 27 Standard Concentrate Output Sap Recirculation Loop...

Страница 28: ...en a minimum of way to start then adjust to the desired concentration level of flow V3 Horizontal Left V4 Vertical Up V18 Horizontal Left V19 With V3 and V4 in the concentrate setting V19 should have...

Страница 29: ...e top of the strainer installed before valve V6 until all the air is released from the system Close the bleed valve 4 When the machine has started adjust V1 and V2 to produce the desired conditions De...

Страница 30: ...ter part of Desugar with lower sugar being rinsed out Desugar Cycle Valve Settings also available on the Quick Start Guide 1 Position the valves as follows V1 Leave valve where it was set during the c...

Страница 31: ...lose the bleed valve 5 Check the concentrate sugar level approximately every 5 minutes The Desugar cycle should be run until the concentrate sugar is 1 to 2 Rinse Cycle In this cycle permeate is run t...

Страница 32: ...l Page 32 Rinse Cycle Valve Settings also available on the Quick Start Guide 1 Position the valves as follows V1 Open the valve completely V2 Open the valve completely V3 Vertical Up V4 Horizontal Lef...

Страница 33: ...not start on the third try bleed the system To bleed the system open the valve on the top of the strainer installed before valve V6 until all the air is released from the system Close the bleed valve...

Страница 34: ...drain posi on 3 At the completion of the rinse cycle add R O soap LEADER Order 69992 to the wash tank and mix Mix alkaline R O soap with the liquid in the wash tank until the required pH is reached T...

Страница 35: ...al Page 35 Wash Cycle Valve Settings also available on the Quick Start Guide 1 Position the valves as follows V1 Open the valve completely V2 Open the valve completely WD Horizontal valve is closed At...

Страница 36: ...sed from the system Close the bleed valve 6 If the system does not start due to a LOW PRESSURE ALARM partially close valve V18 until an operating pressure of 50 80psi is reached and run the remainder...

Страница 37: ...as follows 1 Open the lower drain of the filter housing and allow the liquid to drain from the housing The draining process can be hastened by opening the upper drain also 2 Loosen the eye nuts and r...

Страница 38: ...e bottom of the cup should fit into the hole in the filter 8 Place the compression plate over the threaded rod and lower onto the cup and spring assemblies lining one assembly up in each hole 9 Secure...

Страница 39: ...sh position 3 Set valves V3 and V4 in a rinse cycle position 4 Open the drain of the membrane housing to be changed Allow the membrane to drain until empty 5 Disconnect the permeate line quick coupler...

Страница 40: ...he end of the membrane housing to the body of the membrane housing 10 Remove membrane housing cap from the membrane Determine the style of securing mechanism used to hold the membranes together There...

Страница 41: ...Slide the mated membranes out of the pressure vessel 2 Remove the alignment coupling from the left end of the membrane assembly 3 Place the membrane assembly on a clean solid surface upright with the...

Страница 42: ...mbrane on a solid clean surface 6 Remove the membrane coupler and the clamp halves from each of the membranes Steps for Removal Of Threaded Rod Clamped Membranes 1 Slide the mated membranes out of the...

Страница 43: ...eaded rods Turn the remaining nuts until they are approximately to lower than their original position 6 Remove the spacer ring from the top of the bottom membrane then remove the membrane coupler 7 Re...

Страница 44: ...of the membrane 4 Insert the clamp assembly half into the groove at the top portion of the membrane with the bolts pointed up 5 Using a marker mark the outside edge of the clamp end of each membrane...

Страница 45: ...ngs on the alignment couplings used on both ends of the membranes Lightly lubricate the O rings with permeate or non chlorinated well or spring water Ensure the alignment coupling is in place in the u...

Страница 46: ...sembly Inspect the O rings on the membrane coupler and replace if necessary Lubricate the O rings of the coupler with permeate or non chlorinated well or spring water then insert the coupler into the...

Страница 47: ...emained in place in the pressure vessel 9 Slide the assembled membranes into the membrane housing Ensure the membrane goes all the way into the housing with the membrane coupling at the left end of th...

Страница 48: ...coupler 7 Follow the instructions for the Beginning of Season Startup see page 49 Daily Each day it is recommended the following be done 1 Remove clean and reinstall the strainer in the Y strainer 2...

Страница 49: ...EM lubricant NOTE Lubricate the bearings ONLY at the interval specified Over lubrication will cause the bearings to fail MOTOR FUNCTION HP Bearing Location Lubrication Interval hrs Lubrication Amount...

Страница 50: ...us alkaline soap wash cycle continue to the next step Acid Soak Cycle c If the difference is 15 of less continue with Step 4 3 Do an acid soak cycle see page 34 allow the machine to soak for 1 to 7 da...

Страница 51: ...feed lines 2 Replace prefilters 3 Open the control box by turning the latches on the right side of the panel then opening the door carefully to the left 4 Turn off the pressure and recirculation pump...

Страница 52: ...ER Order 69992 to the wash tank and mix Mix alkaline R O soap with the liquid in the wash tank until the required pH is reached To determine the required pH refer to the Machine Serial Number Data She...

Страница 53: ...Pre Filters need changing System needs to be bled No liquid coming from storage Check the positions of all valves Low rate found during permeability test Suspected bacteria buildup Rewash system with...

Страница 54: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 54 ATTACHMENT 1 ELECTRICAL SCHEMATIC...

Страница 55: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 55...

Страница 56: ...PERMEATE 2 PERMEATE 3 CONCENTRATE TEMPERATURE FEED PUMP MEMBRANE WATER REMOVAL GPH PROCESSED SUGAR CONCENTRATION FLOW gpm PRESSURE psi SUGAR CONCENTRATION FLOW gpm PRESSURE psi ATTACHMENT 2 OPERATION...

Страница 57: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 57 ATTACHMENT 3 PERMEABILITY TEST SHEET...

Страница 58: ...nufacturer defects for a period of two years from the date of purchase This warranty is at the discretion of the manufacturer Leader Evaporator Co Inc to be replaced or repaired as necessary All repla...

Отзывы: