![Leader Evaporator Springtech EXTREME 6 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/leader-evaporator/springtech-extreme-6/springtech-extreme-6_manual_1864740017.webp)
Leader
Evaporator
Springtech
EXTREME
6
Reverse
Osmosis
System
Manual
Page:
17
V3,
V4
and
V19
Connections
V3,
V4
and
V19
valves
are
to
be
setup
so
the
connections
can
be
easily
disconnected
and
reconnected
as
necessary.
The
following
is
the
recommended
connection
detail.
In
order
to
assemble
the
connections
you
will
need
(braided
hose
and
clamps
sold
separately);
3
–
C
style
Quick
Couplers
(two
1
–
½”,
one
1”)
3
(minimum)
stainless
steel
band
clamps
–
(two
(minimum)
1
–
½”,
one
(minimum)
1”)
1”
ID
braided
food
grade
hose
with
length
to
make
the
connection
to
the
Concentrate
tank.
1
–
½”
ID
braided
food
grade
hose
with
length
to
make
the
connection
to
the
Permeate
tank.
The
connection
to
the
drain
can
be
made
with
flexible
hose.
V19
–
Connection
To
Drain
V3
–
Connection
To
Permeate
Storage
1.
Cut
1
–
½”
ID
flexible
hose
to
reach
from
the
valve
V19
to
the
drain
connection.
2.
Place
at
least
one
1
–
½”
stainless
steel
band
clamp
over
one
end
of
the
hose.
3.
Slide
the
hose
onto
the
1
–
½”
C
style
quick
coupler.
4.
Position
the
stainless
steel
band
clamp(s)
over
the
hose
on
the
coupler
and
tighten
the
band
clamp(s).
5.
Secure
the
other
end
of
the
hose
to
the
drain
connection.
6.
Connect
the
quick
couplers
by
opening
the
latches
on
the
C
style
coupler
(position
the
metal
latch
arms
out
perpendicular
to
the
body
of
the
coupler)
then
sliding
the
C
coupler
onto
the
F
coupler.
Pull
the
metal
latch
arms
back
down
to
the
sides
of
the
C
coupler.
1.
Cut
1
–
½”
ID
food
grade
braided
hose
to
length
–
from
valve
V3
to
the
fill
connection
for
the
permeate
tank.
2.
Place
at
least
one
1
–
½”
stainless
steel
band
clamp
over
one
end
of
the
hose.
3.
Slide
the
hose
onto
a
1
–
½”
C
style
quick
coupler.
4.
Position
the
stainless
steel
band
clamp(s)
over
the
hose
on
the
adapter
and
tighten
the
band
clamp(s).
5.
Secure
the
other
end
of
the
hose
to
the
permeate
tank
fill
connection.
6.
Connect
the
quick
couplers
by
opening
the
latch
on
the
C
style
coupler
(position
the
metal
latch
arms
out
perpendicular
to
the
body
of
the
coupler)
then
sliding
the
C
coupler
onto
the
F
coupler.
Pull
the
metal
latch
arms
back
up
to
the
sides
of
the
C
coupler.
Содержание Springtech EXTREME 6
Страница 24: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 24...
Страница 54: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 54 ATTACHMENT 1 ELECTRICAL SCHEMATIC...
Страница 55: ...Leader Evaporator Springtech EXTREME 6 Reverse Osmosis System Manual Page 55...