Check-Out 69
Checking Accessory (Circuit) Relief Cartridge
Use the test fixture and test as shown on illustration.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Attach port-a-power
with 0-3000 psi
gauge to port
marked “P2”
When the adjusted
pressure is reached
(1700 psi), fluid will
drain from port
marked “T2”
Install relief
cartridge in port
marked “SP”. Tighten
to 20 ft. lbs
Locking nut
Part #HYV50000
Содержание 2R-III
Страница 1: ...2R III MAINTENANCE MANUAL...
Страница 2: ......
Страница 3: ...2R III MAINTENANCE MANUAL...
Страница 5: ......
Страница 6: ......
Страница 20: ...10 Introduction...
Страница 42: ...32 Safety...
Страница 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Страница 66: ...56 Preventive Maintenance...
Страница 102: ...92 Troubleshooting...